My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Absher/Stellar J Joint Venture 12/8/2025 (3)
>
Contracts
>
Capital Contract
>
Capital Construction Contracts and Change Orders
>
Absher/Stellar J Joint Venture 12/8/2025 (3)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/9/2025 4:01:59 PM
Creation date
12/9/2025 3:59:50 PM
Metadata
Fields
Template:
Contracts
Contractor's Name
Absher/Stellar J Joint Venture
Approval Date
12/8/2025
Council Approval Date
11/19/2025
Department
Public Works
Department Project Manager
Zach Brown
Subject / Project Title
Port Gardner Storage Facility – Facility Construction Package Addenda
Tracking Number
0005035
Total Compensation
$0.00
Contract Type
Capital Contract
Contract Subtype
Capital Construction Contracts and Change Orders
Retention Period
10 Years Then Transfer to State Archivist
Imported from EPIC
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
99
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
Port Gardner Storage Facility Volume 7 Attachment O <br /> Page 18 <br />CITY OF EVERETT ⋅ 3200 Cedar Street ⋅ Everett, WA 98201 ⋅ (425) 257-8800 ⋅ Fax (425) 257-8882 <br /> <br />Q86 - 4/A-70-4005 shows that the FRP wainscot doesn't extend the entire wall height. <br />Provide the elevations for this FRP in the janitor room of the OMES Building. <br />The FRP wainscot within Area 70, room 102 to be 4-feet high per interior finish <br />legend. <br />Q87 - Confirm ladders on Detail C,D/S-30-3020 are to be newly installed. <br />Area 30 currently has 6 existing ladders, one each in Cells 1, 2, 3, 13, 14, and 15. <br />See Drawing G-00-5002 for cell numbering scheme. Per Drawings GX-30-1001 and <br />GX-30-3001, the ladders in Cells 1, 2, and 3 are to be demolished. The ladders in <br />Cells 13, 14, and 15 are to remain. Per the line weight used on Sheet S-30-1002, <br />new ladders will be installed in Cells 1 through 12. Per Keynote 1 on Drawing S- <br />30-1002, ladders in Cells 13, 14, and 15 will be retained and modified. <br />Q88 - Confirm that SST weir plates as per Sec 2/S-30-3006 are to be installed only in <br />Cell-13 of the Primary combined sewer storage and not in Cell 14 and Cell 15 (S-30- <br />1002). <br />The weir plates shown in Section 2/S-30-3006 are to be installed in Primary <br />Storage Area 30 Cells 13, 14, and 15. <br />Q89 - Spec 11 30 13-2.02 refers to the microwave ovens. Confirm that this is owner <br />provided and installed. <br />Contractor to provide pricing for furnishing and installing microwave oven per <br />the specifications. <br />Q90 - S-70-1001 says to reinstall the existing stair after work is complete. From job walk <br />photos, it looks like the lower staircase of the platform is not existing. Confirm if a new <br />staircase is required and provide details. <br />The Owner temporarily removed the lower portion of the staircase to reduce <br />access while the facility was unoccupied. The lower portion of the staircase will <br />be provided to an on-site location at Owner’s choosing for the Contractor to <br />install. <br />Q91 - Please confirm whether the wet well floors in Area 46 require HP-6 coating. Spec <br />Section 09 90 00 indicate only walls and ceilings are coated. <br />The wet well floor in Area 46 does not require any coating. The finish schedule in <br />09 90 00 is correct; only the walls and ceiling require coating. <br />Q92 - What is the wall thickness of the pipe pile? <br />See Volume 7 Attachment B Geotechnical Engineering Report Port Gardner <br />Storage Facility May 2025, Section 4.6.
The URL can be used to link to this page
Your browser does not support the video tag.