My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Absher/Stellar J Joint Venture 12/8/2025 (3)
>
Contracts
>
Capital Contract
>
Capital Construction Contracts and Change Orders
>
Absher/Stellar J Joint Venture 12/8/2025 (3)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/9/2025 4:01:59 PM
Creation date
12/9/2025 3:59:50 PM
Metadata
Fields
Template:
Contracts
Contractor's Name
Absher/Stellar J Joint Venture
Approval Date
12/8/2025
Council Approval Date
11/19/2025
Department
Public Works
Department Project Manager
Zach Brown
Subject / Project Title
Port Gardner Storage Facility – Facility Construction Package Addenda
Tracking Number
0005035
Total Compensation
$0.00
Contract Type
Capital Contract
Contract Subtype
Capital Construction Contracts and Change Orders
Retention Period
10 Years Then Transfer to State Archivist
Imported from EPIC
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
99
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
Port Gardner Storage Facility Volume 7 Attachment O <br /> Page 32 <br />CITY OF EVERETT ⋅ 3200 Cedar Street ⋅ Everett, WA 98201 ⋅ (425) 257-8800 ⋅ Fax (425) 257-8882 <br /> <br />No. Note 11/A-70-1002 is a gypsum board roof/lid. Roof keynote 1/A-70-1004 is a <br />gypsum board ceiling with gypsum board underneath that creates a ceiling <br />assembly. For more information regarding note 11/A-70-1002, see referenced <br />section 3/A-70-3001, corresponding referenced section 3/A-70-3002, <br />corresponding referenced section 3/A-70-3004, and tagged Assembly G in detail <br />3/A-70-3004 for additional explanation of the construction gypsum board roof/lid. <br />Q173- Specification section 06 10 00 Rough Carpentry is not included in the project <br />manual. Please provide further information for the miscellaneous rough carpentry called <br />out in various architectural details. Should we assume industry standard materials or will <br />a specification section be issued? <br />Assume industry standard wood materials. These are acceptable as this project <br />is primarily steel and concrete construction. <br />Q174- Is there any Buy America(n) requirement for the project? <br />There are no Buy America(n) requirements for this project. <br />Q175- Specification 31 63 33, Article 2.01.D.1 | Specification requires couplers to <br />develop 150% of reinforcing bar strength. Vendors have informed us that the couplers <br />are manufactured to 125% of the reinforcing yield load. Will 125% be acceptable? <br />Couplers shall develop 150% of reinforcing yield strength due to seismic <br />requirements and importance of deep foundations on this project. <br />Q176- Specification 31 63 33, Article 2.01.D.1 | Specification requires couplers to have <br />current ICC-ES report. The Vendors have informed us that “ICC-ESR report is for <br />couplers that are used in reinforcing steel inside concrete columns, and beams in above <br />the ground building structures. It is not used for below the ground structures, such as <br />shoring, soil nails, and piles.” They will not be able to provide ICC-ES reports. Will a <br />conformance letter from the Vendor be acceptable in lieu of ICC-ES report? <br />Conformance letter is acceptable. <br />Q177- Driven 18” Pipes – The Contractor is worried about vibration impacts to the <br />existing structures. Will it be acceptable to torque-in the piles? If so, will torque <br />measurement be acceptable for quality assurance? <br />The contractor could install the piles using torque, then switch to a hammer to <br />verify capacity through penetration resistance. Section 31 09 11 Settlement and <br />Vibration Monitoring requires monitoring of sensitive structures during <br />installation. <br />Q178 - Section 43 16 23 02 -528 gal inverted sewage bladder tank - Section 2.05.C.2 – <br />Process connection should be 2” ANSI Class 150 flanged in lieu of 2” NPT for more <br />reliable sealing.
The URL can be used to link to this page
Your browser does not support the video tag.