Laserfiche WebLink
Port Gardner Storage Facility Volume 7 Attachment O <br /> Page 37 <br />CITY OF EVERETT ⋅ 3200 Cedar Street ⋅ Everett, WA 98201 ⋅ (425) 257-8800 ⋅ Fax (425) 257-8882 <br /> <br />Per 09 90 00 Coating Systems Schedule, "3. Conduit, Piping and Ductwork" all <br />interior - noncorrosive piping shall be coated with system E-1 (FS 25051 Blue) <br />and all exterior - noncorrosive piping shall be coated with EU-1 (FS 20040 Brown). <br />CS piping within the wet wells of Areas 46 and 60 should come shop primed to <br />receive coating system HP-1 as specified in 09 96 00. <br />Q202 - Are we supposed to collect all water when pressure washing? <br />No, water will drain to existing onsite collection system for conveyance to City <br />sewer. <br />Q203 - A-20-1002 Key Note 3 States “repair, paint, finish opening” at two structures but <br />there is no elevation that shows exactly what the two structures are and/or made up of. <br />Please supply. <br />Keynote 3 refers to structural openings for two new mechanical slide gates, as <br />indicated in the drawings. <br />Q204 - D-50-1001 Key Note 4 states to coat the interior and exterior of existing pipe per <br />Area 50 Finish Schedule. Area 50 on the finish schedule under 09 90 00 lists “Acre 50 – <br />36” exposed piping (interior) as E-1. Please clarify if both the interior and exterior of the <br />pipe are to receive E-1. If the interior of the pipe is to be coated how far back is one <br />supposed to assume for the coating? <br />Full interior of 36" pipes to be coated with E-1 per Finish Schedule. The pipes are <br />not very long. Coat exterior per Finish Schedule “3. Conduit, Piping and <br />Ductwork" with coating system EU-1 (FS 20040 Brown). <br />Q205 - Please confirm when Key Notes state “to remain undisturbed” that no work is to <br />be done on these areas. <br />To clarify, below is a list of where “to remain undisturbed” is used in the <br />drawings. In general, it relates to existing elements that are to remain and is used <br />to identify what these elements are. If additional work is required, it is done via <br />additional notation or keynotes in the documents. <br />• On A-06-3002, Details 9 and 10 it relates to maintaining the existing <br />building structure to remain. <br />• A-70-1001 Keynote 13 notes an existing ladder, referenced in question 7 <br />above. Ladder to remain in place and be painted per Keynote 7 on A-70- <br />1002. <br />• A-70-1002 Keynote 8 notes an existing platform and stairs to remain. <br />• A-70-1003 Keynote 4 notes an existing platform and stairs to remain. <br />• A-70-2001 Keynote 10 notes existing building structure to remain. <br />• A-70-3004 Detail 6 notes existing building structure to remain. <br />• A-70-4001 Keynote 13 notes an existing platform and stairs to remain. <br />• A-70-4002 Keynote 9 notes existing platform and stairs to remain.