My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Absher/Stellar J Joint Venture 12/8/2025 (3)
>
Contracts
>
Capital Contract
>
Capital Construction Contracts and Change Orders
>
Absher/Stellar J Joint Venture 12/8/2025 (3)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/9/2025 4:01:59 PM
Creation date
12/9/2025 3:59:50 PM
Metadata
Fields
Template:
Contracts
Contractor's Name
Absher/Stellar J Joint Venture
Approval Date
12/8/2025
Council Approval Date
11/19/2025
Department
Public Works
Department Project Manager
Zach Brown
Subject / Project Title
Port Gardner Storage Facility – Facility Construction Package Addenda
Tracking Number
0005035
Total Compensation
$0.00
Contract Type
Capital Contract
Contract Subtype
Capital Construction Contracts and Change Orders
Retention Period
10 Years Then Transfer to State Archivist
Imported from EPIC
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
99
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
Port Gardner Storage Facility Volume 7 Attachment O <br /> Page 37 <br />CITY OF EVERETT ⋅ 3200 Cedar Street ⋅ Everett, WA 98201 ⋅ (425) 257-8800 ⋅ Fax (425) 257-8882 <br /> <br />Per 09 90 00 Coating Systems Schedule, "3. Conduit, Piping and Ductwork" all <br />interior - noncorrosive piping shall be coated with system E-1 (FS 25051 Blue) <br />and all exterior - noncorrosive piping shall be coated with EU-1 (FS 20040 Brown). <br />CS piping within the wet wells of Areas 46 and 60 should come shop primed to <br />receive coating system HP-1 as specified in 09 96 00. <br />Q202 - Are we supposed to collect all water when pressure washing? <br />No, water will drain to existing onsite collection system for conveyance to City <br />sewer. <br />Q203 - A-20-1002 Key Note 3 States “repair, paint, finish opening” at two structures but <br />there is no elevation that shows exactly what the two structures are and/or made up of. <br />Please supply. <br />Keynote 3 refers to structural openings for two new mechanical slide gates, as <br />indicated in the drawings. <br />Q204 - D-50-1001 Key Note 4 states to coat the interior and exterior of existing pipe per <br />Area 50 Finish Schedule. Area 50 on the finish schedule under 09 90 00 lists “Acre 50 – <br />36” exposed piping (interior) as E-1. Please clarify if both the interior and exterior of the <br />pipe are to receive E-1. If the interior of the pipe is to be coated how far back is one <br />supposed to assume for the coating? <br />Full interior of 36" pipes to be coated with E-1 per Finish Schedule. The pipes are <br />not very long. Coat exterior per Finish Schedule “3. Conduit, Piping and <br />Ductwork" with coating system EU-1 (FS 20040 Brown). <br />Q205 - Please confirm when Key Notes state “to remain undisturbed” that no work is to <br />be done on these areas. <br />To clarify, below is a list of where “to remain undisturbed” is used in the <br />drawings. In general, it relates to existing elements that are to remain and is used <br />to identify what these elements are. If additional work is required, it is done via <br />additional notation or keynotes in the documents. <br />• On A-06-3002, Details 9 and 10 it relates to maintaining the existing <br />building structure to remain. <br />• A-70-1001 Keynote 13 notes an existing ladder, referenced in question 7 <br />above. Ladder to remain in place and be painted per Keynote 7 on A-70- <br />1002. <br />• A-70-1002 Keynote 8 notes an existing platform and stairs to remain. <br />• A-70-1003 Keynote 4 notes an existing platform and stairs to remain. <br />• A-70-2001 Keynote 10 notes existing building structure to remain. <br />• A-70-3004 Detail 6 notes existing building structure to remain. <br />• A-70-4001 Keynote 13 notes an existing platform and stairs to remain. <br />• A-70-4002 Keynote 9 notes existing platform and stairs to remain.
The URL can be used to link to this page
Your browser does not support the video tag.