Port Gardner Storage Facility Volume 7 Attachment O <br /> Page 43 <br />CITY OF EVERETT ⋅ 3200 Cedar Street ⋅ Everett, WA 98201 ⋅ (425) 257-8800 ⋅ Fax (425) 257-8882 <br /> <br /> <br />Q233 - Please confirm S-2 is the correct floor coating in regards to the Key note 3 on A- <br />25-3002 for the main entrance concrete. Reference details 1 & 2 indicating key note 3. <br />Is the coating supposed to terminate at only horizontal concrete or wrap onto the <br />vertical concrete? <br />Confirmed, S-2 is the floor coating specified for concrete floors per 09 90 00. <br />Coating shall wrap onto the vertical concrete surfaces. <br />Q234 - Dwg S-70-3010, Detail A provides structural steel member sizes for posts and <br />beams, however cantilevered/stiffener members are not detailed on this sheet or the <br />referenced A-70-3004. Can you please clarify? <br />Plate thicknesses shall be ½”. <br />Q235 - Please provide minimum height for equipment pads <br />Unless otherwise specified, equipment pads shall have a minimum height of 4” <br />per Standard Detail S81001 provided in Volume 7. <br />Q236 - Drawing CX-10-9004 shows 2 gates to be demolished, photos 3 & 4. Is there <br />any electrical wires that need to be demolished associated with these gates? <br />Buried electrical wires to be demolished that are presumed to supply gate power <br />are shown demolished on Drawing CX-10-2004. For buried conduit and wire <br />supplying gate power not identified to be demolished and not in areas otherwise <br />disturbed in the course of new Work may be abandoned in place. <br />Q237 - Spec section 03 30 00-3.20.A.7 indicates “Provide water for testing <br />[watertightness] and re-testing…”. Spec section 01 50 00-1.2.G.1 indicates “Water for <br />construction purposes shall be furnished by the Owner.” We assume that the water <br />furnished by the Owner can be used for watertightness testing. Please confirm. <br />Confirmed, water for watertightness testing will be provided by the Owner. <br />Contractor shall furnish all necessary equipment and materials required for the <br />temporary water service as outlined in 01 50 00 1.2.G. See also Section 01 91 00, <br />and 01 91 00, Exhibit B for scope of work to install a temporary Deep Water <br />Outfall 100 bypass to provide water for testing and commissioning purposes. <br />Q238 - We would like to request that the “optional” primer listed under 09 96 00 be <br />changed to required. <br />The specification will not be modified as requested. Primers are listed as optional <br />based on manufacturer requirements and for controlling outgassing. Outgassing <br />is defined in Section 09 96 00 1.03 A.34. Any deviations from the specification are <br />to be noted during the submittal review. <br />Q239 - Conduit number C10101 in DB0011B is not shown in the raceway or cable <br />schedule. Please clarify the conduit size and cables associated with this conduit.