My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Absher/Stellar J Joint Venture 12/8/2025 (3)
>
Contracts
>
Capital Contract
>
Capital Construction Contracts and Change Orders
>
Absher/Stellar J Joint Venture 12/8/2025 (3)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/9/2025 4:01:59 PM
Creation date
12/9/2025 3:59:50 PM
Metadata
Fields
Template:
Contracts
Contractor's Name
Absher/Stellar J Joint Venture
Approval Date
12/8/2025
Council Approval Date
11/19/2025
Department
Public Works
Department Project Manager
Zach Brown
Subject / Project Title
Port Gardner Storage Facility – Facility Construction Package Addenda
Tracking Number
0005035
Total Compensation
$0.00
Contract Type
Capital Contract
Contract Subtype
Capital Construction Contracts and Change Orders
Retention Period
10 Years Then Transfer to State Archivist
Imported from EPIC
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
99
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
Port Gardner Storage Facility Volume 7 Attachment O <br /> Page 43 <br />CITY OF EVERETT ⋅ 3200 Cedar Street ⋅ Everett, WA 98201 ⋅ (425) 257-8800 ⋅ Fax (425) 257-8882 <br /> <br /> <br />Q233 - Please confirm S-2 is the correct floor coating in regards to the Key note 3 on A- <br />25-3002 for the main entrance concrete. Reference details 1 & 2 indicating key note 3. <br />Is the coating supposed to terminate at only horizontal concrete or wrap onto the <br />vertical concrete? <br />Confirmed, S-2 is the floor coating specified for concrete floors per 09 90 00. <br />Coating shall wrap onto the vertical concrete surfaces. <br />Q234 - Dwg S-70-3010, Detail A provides structural steel member sizes for posts and <br />beams, however cantilevered/stiffener members are not detailed on this sheet or the <br />referenced A-70-3004. Can you please clarify? <br />Plate thicknesses shall be ½”. <br />Q235 - Please provide minimum height for equipment pads <br />Unless otherwise specified, equipment pads shall have a minimum height of 4” <br />per Standard Detail S81001 provided in Volume 7. <br />Q236 - Drawing CX-10-9004 shows 2 gates to be demolished, photos 3 & 4. Is there <br />any electrical wires that need to be demolished associated with these gates? <br />Buried electrical wires to be demolished that are presumed to supply gate power <br />are shown demolished on Drawing CX-10-2004. For buried conduit and wire <br />supplying gate power not identified to be demolished and not in areas otherwise <br />disturbed in the course of new Work may be abandoned in place. <br />Q237 - Spec section 03 30 00-3.20.A.7 indicates “Provide water for testing <br />[watertightness] and re-testing…”. Spec section 01 50 00-1.2.G.1 indicates “Water for <br />construction purposes shall be furnished by the Owner.” We assume that the water <br />furnished by the Owner can be used for watertightness testing. Please confirm. <br />Confirmed, water for watertightness testing will be provided by the Owner. <br />Contractor shall furnish all necessary equipment and materials required for the <br />temporary water service as outlined in 01 50 00 1.2.G. See also Section 01 91 00, <br />and 01 91 00, Exhibit B for scope of work to install a temporary Deep Water <br />Outfall 100 bypass to provide water for testing and commissioning purposes. <br />Q238 - We would like to request that the “optional” primer listed under 09 96 00 be <br />changed to required. <br />The specification will not be modified as requested. Primers are listed as optional <br />based on manufacturer requirements and for controlling outgassing. Outgassing <br />is defined in Section 09 96 00 1.03 A.34. Any deviations from the specification are <br />to be noted during the submittal review. <br />Q239 - Conduit number C10101 in DB0011B is not shown in the raceway or cable <br />schedule. Please clarify the conduit size and cables associated with this conduit.
The URL can be used to link to this page
Your browser does not support the video tag.