My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Absher/Stellar J Joint Venture 12/8/2025 (3)
>
Contracts
>
Capital Contract
>
Capital Construction Contracts and Change Orders
>
Absher/Stellar J Joint Venture 12/8/2025 (3)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/9/2025 4:01:59 PM
Creation date
12/9/2025 3:59:50 PM
Metadata
Fields
Template:
Contracts
Contractor's Name
Absher/Stellar J Joint Venture
Approval Date
12/8/2025
Council Approval Date
11/19/2025
Department
Public Works
Department Project Manager
Zach Brown
Subject / Project Title
Port Gardner Storage Facility – Facility Construction Package Addenda
Tracking Number
0005035
Total Compensation
$0.00
Contract Type
Capital Contract
Contract Subtype
Capital Construction Contracts and Change Orders
Retention Period
10 Years Then Transfer to State Archivist
Imported from EPIC
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
99
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
Port Gardner Storage Facility Volume 7 Attachment O <br /> Page 44 <br />CITY OF EVERETT ⋅ 3200 Cedar Street ⋅ Everett, WA 98201 ⋅ (425) 257-8800 ⋅ Fax (425) 257-8882 <br /> <br />Conduit C10101 is to be used as a spare raceway, size is 2”. Install pull rope in <br />raceway. <br />Q240 - C40002B in DB0006B is not shown on conduit schedule. Please clarify conduit <br />size and cable needed. <br />Conduit C40002B is to be used as a spare raceway, size is 3-1/2”. Install pull rope <br />in raceway. <br />Q241 - Spec section 26 05 36 2.02 B.1.c. states "Cable tray widths shall be 24 and 36 <br />inches as shown on drawings" However drawing EG-70-2001 the cable tray are <br />measuring out to 12" and 24". Please confirm the size of the cable. <br />Use cable tray widths as identified on Drawings & Schedules. <br />Q242 - Drawing EG-70-3001 show a "Cable Transition System." Please provide more <br />detail e.g. manufacturer catalog number. <br />The system used during design was based on the Roxtec (www.roxtec.com) <br />sealing solution for transition & support of cables when routing through building <br />wall. <br />Q243 - Drawing EP-70-1002: 1. Raceway Identifier missing for (7) mechanical devices <br />(e.g. 70-EF-01, 70-UH-0104...) 2. Raceway Identifier C70001 & C70002 contradicts <br />Cable Raceway Schedule destination, which is appropriate. 3. Raceway Identifier <br />missing for (70-MCC-0001). <br />1. Raceway identifier intentionally omitted as those loads are to be field run <br />between the exhaust fans & unit heaters in question back to 70-PNL-3001. <br />See panel schedule on EP-70-7001. <br />2. C70001 & C70002 are mislabeled raceways on drawing EP-70-1002. Relabel <br />C70001 & C70002 to C30001A & C30002A respectively (not in cable/raceway <br />schedule). Each of these 2” conduits route cables 30-C0001 & 30-C0002 <br />(36C #14 TCER cable) between the HPU (70-LCP-5000) and cable tray <br />CTC002, then continuing to 30-CJB-0001 & 30-CJB-0002 for Area 30 <br />Flushing Gate Equipment. <br />3. 70-HPU-5000 is powered from 70-PNL-3000, not the MCC. The raceway <br />identifier has been intentionally omitted as the loads in that circuit are to be <br />field run. <br />Q244 - Concrete repair is shown on numerous drawings for this project. Please confirm <br />ALL types of concrete repairs, including but not limited to concrete infill repairs, for this <br />project will be covered under Bid Item #30.
The URL can be used to link to this page
Your browser does not support the video tag.