My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2025/12/10 Council Agenda Packet
>
Council Agenda Packets
>
2025
>
2025/12/10 Council Agenda Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/11/2025 8:54:16 AM
Creation date
12/11/2025 8:47:05 AM
Metadata
Fields
Template:
Council Agenda Packet
Date
12/10/2025
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
327
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
<br /> City Council Agenda Item Cover Sheet <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br />Project title: <br /> An Ordinance Creating a Special Improvement Project Entitled “Garfield Park Playground <br />Renovation”, Fund 354, Program 109, to Accumulate all Costs for the Project <br />Council Bill # <br /> CB 2512-86 <br /> Project: Garfield Park Playground Renovation <br />Partner/Supplier: KCDA Contract 22-315 Vendor TBD <br /> Location: 2300 Walnut Street <br />Preceding action: None <br />Fund: 354, Program 109 (CIP 3) <br />Agenda dates requested: <br /> <br />Briefing <br />Proposed Action 12/10/25 <br />Proposed Action 12/10/25 <br />Consent <br />Action 12/17/25 <br /> <br />Ordinance X <br />Public hearing <br /> Yes X No <br /> <br />Budget amendment: <br /> Yes X No <br /> <br />PowerPoint presentation: <br /> Yes X No <br /> <br />Attachments: <br />Funding Ordinance <br /> <br />Department(s) involved: <br />Parks & Facilities <br /> <br /> <br />Contact person: <br />Bob Leonard <br /> <br />Phone number: <br />425-257-8335 <br /> <br />Email: <br />bleonard@everettwa.gov <br />Initialed by: <br /> RML <br />Department head <br /> <br />Administration <br /> <br />Council President <br />Fiscal summary statement: <br />The proposed Funding Ordinance will fund the full replacement of the existing play equipment <br />and surfacing material at an estimated cost of $940,000. Equipment procurement and <br />installation will be through King County Directors Association (KCDA) Cooperative. <br /> <br /> <br />Project summary statement: <br />This project will renovate the playground area at Garfield Park. The playground is 19 years old <br />and exceeds the City of Everett Park’s life-cycle standard of 15 years. Replacement of the <br />existing equipment will update the playground to current industry standards and add options <br />for accessible play. <br /> <br />The anticipated start of construction is Fall 2026. <br /> <br /> <br /> <br /> <br /> <br /> <br />Recommendation (exact action requested of Council): <br />Adopt an Ordinance creating a Special Improvement Project entitled “Garfield Park Playground <br />Renovation”, Fund 354, Program 109, to accumulate all costs for the project. <br />
The URL can be used to link to this page
Your browser does not support the video tag.