Laserfiche WebLink
Absher/Stellar J Joint Venture <br />October 22, 2025 <br />1001 Shaw Rd <br />Puyallup, WA 98372 <br />253.845.9544 <br />1. WRF Phase 2 Upgrades 2022 City of Yelm Yelm, WA $35M <br />2. Primary Clarifier, Hauled Waste, <br />Aerobic Digester, and Dryer Upgrades 2024 Three Rivers Regional <br />Wastewater Authority Longview, WA $40M <br />3. Biosolids Handling Facilities 2024 City of Washougal Washougal, WA $28M