1. WRF Phase 2 Upgrades
<br />Schedule A – Liquid Process: Conversion of an existing Sequencing Batch Reactor (SBR) water reclamation
<br />facility (WRF) to a new membrane bioreactor (MBR) WRF including all ancillary equipment needed to support
<br />the MBR treatment system including but not limited to: Obtain and comply with permits; Partial demolition
<br />of SBR tanks, Blower equipment, pump station, Effluent Filters, lagoon equipment, power generators, chlorine
<br />contact tank, Influent structure, Solids building equipment, and abandoning site pipe; Construction of Mechani-
<br />cal Electrical Building, MBR tanks, Aeration tank walls, Headworks, Feed Forward Building, MBR CIP Building,
<br />Distribution structures, flow channels, Chemical Building, and Plant Drain Pump Station; Excavation, Paving
<br />and restoration; Supply and installation of headworks drum screens, gates and control panels; Supply and Instal-
<br />lation of grit removal system with pump and classifier; Supply and installation of blowers, pumps, sanitary sewer
<br />piping, and supports; Supply and installation of MBR submerged membrane units (SMUs) in MBR tanks; Instal-
<br />lation includes all piping, equipment and instruments provided by MBR manufacturer; Stainless steel, ductile
<br />iron and other pipe supply and installation; Supply and installation of electrical MCCs, VFDs, instruments, duct
<br />banks, conduit, and PLC replacement; Supply and installation of standby generator with fuel tank and trans-
<br />former; Demolition and replacement of existing pipe, conduits, metal supports, and doors at the facility; Supply
<br />and installation of HVAC systems and louvers.
<br />Schedule B – Solids Handling: Supply and install new centrifuge; polymer feed systems, controls, and convey-
<br />ors; a biodryer constructed with expansion for second with up to three boilers, odor control, a 2,400-square
<br />foot weather enclosure, and ancillary equipment to produce an exceptional quality Class A Biosolid; and a new
<br />septage receiving station with screening, valving and metering, odor control, a storage tank, and pump station.
<br />Phase startup, temporary pipes/pumps and commissioning of facility equipment; and other facility improve-
<br />ments and additions as shown on the Contract Drawings.
<br />• MGD: 2.2
<br />2. Primary Clarifier, Hauled Waste, Aerobic Digester, and Dryer Upgrades
<br />Construction of two primary clarifiers, an aerobic digester, digester control building, headworks improvements,
<br />installation and commissioning of an owner-furnished biosolids drying system, and a hauled waste receiving
<br />and pump station at the Three Rivers Regional Wastewater Treatment Plant. Other work includes a flow split-
<br />ter structure and gates, replacement of primary sludge pumps and piping, associated yard piping, electrical
<br />upgrades, instrumentation and controls upgrades, grading and drainage improvements, and paving. The work
<br />includes demolition of two clarifiers, existing headworks channels, primary diversion structure, primary sludge
<br />pumps and piping, grit removal equipment, hauled waste station equipment, and solids handling equipment. The
<br />headworks improvements include installation of a grit chamber and bypass structure. Solids handling improve-
<br />ments will include installation of several sludge pumps, a rotary drum thickener, and a drum dryer system.
<br />• MGD: 26.0
<br />• Groundwater pumping and disposal
<br />• Auger-cast piles
|