Laserfiche WebLink
1. WRF Phase 2 Upgrades <br />Schedule A – Liquid Process: Conversion of an existing Sequencing Batch Reactor (SBR) water reclamation <br />facility (WRF) to a new membrane bioreactor (MBR) WRF including all ancillary equipment needed to support <br />the MBR treatment system including but not limited to: Obtain and comply with permits; Partial demolition <br />of SBR tanks, Blower equipment, pump station, Effluent Filters, lagoon equipment, power generators, chlorine <br />contact tank, Influent structure, Solids building equipment, and abandoning site pipe; Construction of Mechani- <br />cal Electrical Building, MBR tanks, Aeration tank walls, Headworks, Feed Forward Building, MBR CIP Building, <br />Distribution structures, flow channels, Chemical Building, and Plant Drain Pump Station; Excavation, Paving <br />and restoration; Supply and installation of headworks drum screens, gates and control panels; Supply and Instal- <br />lation of grit removal system with pump and classifier; Supply and installation of blowers, pumps, sanitary sewer <br />piping, and supports; Supply and installation of MBR submerged membrane units (SMUs) in MBR tanks; Instal- <br />lation includes all piping, equipment and instruments provided by MBR manufacturer; Stainless steel, ductile <br />iron and other pipe supply and installation; Supply and installation of electrical MCCs, VFDs, instruments, duct <br />banks, conduit, and PLC replacement; Supply and installation of standby generator with fuel tank and trans- <br />former; Demolition and replacement of existing pipe, conduits, metal supports, and doors at the facility; Supply <br />and installation of HVAC systems and louvers. <br />Schedule B – Solids Handling: Supply and install new centrifuge; polymer feed systems, controls, and convey- <br />ors; a biodryer constructed with expansion for second with up to three boilers, odor control, a 2,400-square <br />foot weather enclosure, and ancillary equipment to produce an exceptional quality Class A Biosolid; and a new <br />septage receiving station with screening, valving and metering, odor control, a storage tank, and pump station. <br />Phase startup, temporary pipes/pumps and commissioning of facility equipment; and other facility improve- <br />ments and additions as shown on the Contract Drawings. <br />• MGD: 2.2 <br />2. Primary Clarifier, Hauled Waste, Aerobic Digester, and Dryer Upgrades <br />Construction of two primary clarifiers, an aerobic digester, digester control building, headworks improvements, <br />installation and commissioning of an owner-furnished biosolids drying system, and a hauled waste receiving <br />and pump station at the Three Rivers Regional Wastewater Treatment Plant. Other work includes a flow split- <br />ter structure and gates, replacement of primary sludge pumps and piping, associated yard piping, electrical <br />upgrades, instrumentation and controls upgrades, grading and drainage improvements, and paving. The work <br />includes demolition of two clarifiers, existing headworks channels, primary diversion structure, primary sludge <br />pumps and piping, grit removal equipment, hauled waste station equipment, and solids handling equipment. The <br />headworks improvements include installation of a grit chamber and bypass structure. Solids handling improve- <br />ments will include installation of several sludge pumps, a rotary drum thickener, and a drum dryer system. <br />• MGD: 26.0 <br />• Groundwater pumping and disposal <br />• Auger-cast piles