My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Absher/Stellar J Joint Venture 12/11/2025
>
Contracts
>
Capital Contract
>
Capital Construction Contracts and Change Orders
>
Absher/Stellar J Joint Venture 12/11/2025
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/12/2025 2:38:17 PM
Creation date
12/12/2025 2:35:21 PM
Metadata
Fields
Template:
Contracts
Contractor's Name
Absher/Stellar J Joint Venture
Approval Date
12/11/2025
Council Approval Date
11/19/2025
Department
Public Works
Department Project Manager
Zach Brown
Subject / Project Title
Port Gardner Storage Facility – Facility Construction Package
Tracking Number
0005035
Total Compensation
$0.00
Contract Type
Capital Contract
Contract Subtype
Capital Construction Contracts and Change Orders
Retention Period
10 Years Then Transfer to State Archivist
Imported from EPIC
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
81
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
3. Biosolids Handling Facilities <br />Construction of new biosolids management facilities at the City of Washougal wastewater treatment plant <br />(WWTP) which will consist of a new biological selector, aerobic digester, <br />biosolids handling building, and addition of odor control in the existing headworks building. <br />The City is working on multiple upgrades to the WWTP to reduce potential environmental impacts of the sludge <br />lagoons to the adjacent Steigerwald National Wildlife Refuge, reduce <br />odors, and improve effluent quality discharged to the Columbia River. The new solids handling building setup <br />will include a rotary drum thickener, screw press dewatering, <br />polymer activation and dosing, aeration blowers, electrical room for control panels and Motor Control Centers <br />(MCCs), and conveyor system to biosolids storage. Other processes <br />in the plant will include odor control in the headwork and solids handling processes, biological selector, decom- <br />missioning of the existing lagoon storage system, addition of aerobic solids digestion, WAS pump replacement, <br />and upgrade of the existing utility water system. Two (2) new solids handling structures are proposed for the <br />project: an aerobic digester and a solids handling building. The new structures are to be constructed in the loca- <br />tion of <br />Lagoon 1, which will be fully decommissioned and filled. One (1) new treatment structure will be constructed <br />between the headworks and the oxidation ditches: the biological selector. <br />• MGD: 26.0 <br />3 <br />X <br />X <br />X <br />X
The URL can be used to link to this page
Your browser does not support the video tag.