Laserfiche WebLink
<br />City of Everett • 2024 Comprehensive Sewer Plan • October 2025 <br />Executive Summary • ES-15 <br />Table ES-5 | Long Term Capacity Driven Projects <br />CIP No. Project Name Rounded Project Cost <br />(2024 Dollars) <br />CIP-CON-2 Annual Pipe Rehabilitation and Replacement (10-20 yr) $7,166,200/yr <br />CIP-CAP-COM-1 5th Street Storage Upgrade $13,870,000 <br />CIP-CAP-COM-10B LS09 Firm Capacity and Force Main Upgrade $13,400,000 <br />CIP-CAP-COM-12 17th St Interceptor Tributary Pipe Capacity Increase $13,650,000 <br />CIP-CAP-COM-13 Rucker Avenue Pipe Capacity Increase $1,560,000 <br />CIP-CAP-COM-14 19th Street Pipe Capacity Increase $1,900,000 <br />CIP-CAP-COM-15 23rd Street Pipe Capacity Increase $1,660,000 <br />CIP-CAP-COM-16 24th Street Pipe Capacity Increase $1,410,000 <br />CIP-CAP-COM-17 25th Street Pipe Capacity Increase $860,000 <br />CIP-CAP-COM-18 Grand Avenue Pipe Capacity Increase $2,940,000 <br />CIP-CAP-COM-19 West Marine View Drive Pipe Capacity Increase $880,000 <br />CIP-CAP-COM-2 Legion Memorial Golf Course Pipe Capacity Increase $590,000 <br />CIP-CAP-COM-20 Nassau St Pipe Capacity Increase $2,070,000 <br />CIP-CAP-COM-21 Wall Street & Grand Ave Pipe Capacity Increase $3,610,000 <br />CIP-CAP-COM-22 Colby Avenue & Wall Street Pipe Capacity Increase $810,000 <br />CIP-CAP-COM-24 Federal Avenue Pipe Capacity Increase $1,880,000 <br />CIP-CAP-COM-26 Hoyt Avenue Pipe Capacity Increase $400,000 <br />CIP-CAP-COM-27 Tulalip Avenue Capacity Increase $800,000 <br />CIP-CAP-COM-29 Rockefeller Avenue & 22nd Street Pipe Capacity Increase $2,920,000 <br />CIP-CAP-COM-31 Broadway Avenue & 21st Street Pipe Capacity Increase $3,810,000 <br />CIP-CAP-COM-38 Broadway Trunk Interceptor Parallel Pipe Installation and Pipe <br />Capacity Increase $9,700,000 <br />CIP-CAP-COM-39 Fleming Street Pipe Capacity Increase $3,230,000 <br />CIP-CAP-COM-5 14th Street Pipe Capacity Increase $2,140,000 <br />CIP-CAP-COM-53 43rd Street SE Pipe Capacity Increase $620,000 <br />CIP-CAP-COM-54 41st Street Creek Diversion $11,200,000 <br />CIP-CAP-COM-55 Memorial Stadium Pipe Installation $3,440,000 <br />CIP-CAP-COM-6 Hayes Street Pipe Capacity Increase $6,740,000 <br />CIP-CAP-COM-61 Chestnut Street & 22nd Street Pipe Capacity Increase $8,870,000 <br />CIP-CAP-COM-8 Chestnut Street & E Marine View Drive Pipe Capacity Increase $664,000 <br />CIP-CAP-COM-9 15th Street Pipe Capacity Increase $390,000 <br />CIP-CAP-SEP-11B Increase LS18 Pump and Downstream Pipe Capacity $2,700,000 <br />CIP-CAP-SEP-12 Increase LS19 Pump Capacity $3,500,000 <br />CIP-CAP-SEP-1B LS15 Capacity Increase and Force Main Expansion $9,800,000 <br />CIP-CAP-SEP-3 Merrill Creek Parkway Pipe Capacity Increase $8,670,000 <br />CIP-CAP-SEP-5 Dogwood Drive Pipe Capacity Increase $4,430,000 <br />CIP-CAP-SEP-7 Seal Manholes in 37th St Trunk Basin $20,000 <br />CIP-CAP-SEP-8 Evergreen Way Pipe Capacity Increase $9,280,000 <br />Total (2024 dollars) $226,076,000 <br />Note: <br />Project costs are an estimate and subject to change in the future.