My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Resolution 8245
>
Resolutions
>
Resolution 8245
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/15/2025 7:30:26 AM
Creation date
12/15/2025 7:29:31 AM
Metadata
Fields
Template:
Resolutions
Resolution Number
8245
Date
12/10/2025
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
18
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
<br />City of Everett • 2024 Comprehensive Sewer Plan • October 2025 <br />Executive Summary • ES-16 <br />Table ES-6 | Total CIP <br />CIP Timeframe Total Cost (Inflated Dollars1) <br />Existing CIP 2024-2033 $470,830,000 <br />Proposed CIP (Near Term) 2024-2033 $226,349,000 <br />Proposed CIP (Long Term) 2034-2043 $348,942,000 <br />Total $1,046,121,000 <br />Note: <br />1. Assumes inflation at 3 percent per year. <br />Financial Program <br />Chapter 12 consists of the financial analysis performed by FCS group to develop a funding plan (“revenue <br />requirement”) for the City’s sewer utility for the 2024 to 2043 planning horizon. The revenue requirement <br />was identified based on operating and maintenance expenditures, fiscal policies, and the capital funding <br />needs identified in Chapter 11. <br />The results of the analysis indicates that a rate adjustment of 14 percent per year 2025 to 2026 and 12 <br />percent per year 2027 to 2028 would be sufficient to support the capital program in the near term. A 12 <br />percent increase per year would need to continue for 2029 and 2030, followed by 8 percent increases in <br />2031 and 2032, with the additional caveat that there be a 30 percent deferral of planned capital spending <br />in 2029 and 2030, with those projects (or portions of projects) occurring instead in 2039 and 2040. Table <br />ES-7 shows the “across-the-board” rate adjustments for the next five years, applied to the City’s monthly <br />fixed rate for the Metered Residential and Commercial customer classes. The same percentage rate <br />adjustments apply to all classes and rates. It is recommended to conduct another detailed rate study before <br />2029 to reassess financial statements and strategies. <br />Table ES-7 | Monthly Fixed Rate Adjustments from 2025 to 2029 <br />Metered Residential & Commercial Class 2024 2025 2026 2027 2028 2029 <br />Rate Increase - 15.5% 14.0% 12.0% 12.0% 12.0% <br />Fixed Charge $57.94 $66.92 $76.29 $85.44 $95.70 $107.18 <br />Change ($) - +$8.98 +$9.37 +$9.15 +$10.26 +$11.48 <br />
The URL can be used to link to this page
Your browser does not support the video tag.