My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Interwest Construction Inc. 12/17/2025
>
Contracts
>
Capital Contract
>
Capital Construction Contracts and Change Orders
>
Interwest Construction Inc. 12/17/2025
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/17/2025 10:39:10 AM
Creation date
12/17/2025 10:24:02 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Interwest Construction Inc.
Approval Date
12/17/2025
Council Approval Date
12/10/2025
Department
Public Works
Department Project Manager
Amie Campbell
Subject / Project Title
Water Main Y, Phase 2
Tracking Number
0005048
Total Compensation
$2,020,202.02
Contract Type
Capital Contract
Contract Subtype
Capital Construction Contracts and Change Orders
Retention Period
10 Years Then Transfer to State Archivist
Imported from EPIC
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
591
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
CITY OF EVERETT SPECIAL PROVISIONS <br /> <br />Water Main Replacement “Y” – Ph 2 Div 1 – GEN REQUIREMENTS October 2025 <br />Work Order No. UP 3814 SP-102 <br />Category 2: Sensitive information <br />Category 2: For official use only / disclosure permissible by law. <br />The Contractor shall notify the Railroad Company a minimum of 15 days in <br />advance of whenever the Contractor is about to perform Work within Railroad <br />Company property or within 25 feet of the centerline of tracks to enable the <br />Railroad Company to provide flagging or other protective services. <br />The Railroad Company’s contact to schedule flagging or other protective services <br />is: <br />Wilson & Company (BNSF’s Scheduling Agent) <br />Contact WilsonCompany.Utility.IC@wilsonco.com (preferred method) or call <br />(816) 556-3624. <br />1-07.28(8) Measurement and Payment <br />Section 1-07.28(8) is revised to read: <br />(October 3, 2022 WSDOT GSP) <br />The Contracting Agency will make payments to the Railroad for protective services <br />unless: <br />1. Such services result from the Contractor’s failure to comply with the <br />terms and conditions of its contract with the Contracting Agency or with <br />its Contractor’s Right of Entry Agreements with the Railroad Company. <br />2. The Contractor fails to obtain authorization from the Engineer prior to <br />coordinating with the Railroad Company for any flagging requiring <br />overtime payments as specified under Railroad Safety and Flagging. <br />3. The Contractor arranges for assignment of a railroad flagger and alters <br />project work so that a flagger is no longer needed, and adequate <br />advance notice is not provided to the Railroad Company of such change <br />in the need for a flagger (i.e., causing the Railroad Company to dispatch <br />a flagger billable to the project when one is not required). <br />4. The Contractor causes an emergency, as specified under Railroad <br />Operations. <br />5. Protective services are required as a result of a request to the Railroad <br />Company for the Contractor’s convenience. <br />6. The Contract provides for a bid item in the Contract. <br />All costs to comply with this Section, unless otherwise stated, are incidental to the <br />Contract and are the responsibility of the Contractor. The Contractor shall include <br />all related costs in the unit Bid prices of the Contract. <br /> <br />1-08 PROSECUTION AND PROGRESS <br />Supplement Section 1-08 by adding the following: <br />1-08.0 Preliminary Matters <br />1-08.0(1) Preconstruction Conference <br />Prior to the Contractor beginning the Work, a preconstruction conference will be held <br />between the Contractor, the Engineer, WSDOT and such other interested parties as may <br />be invited. The purpose of the preconstruction conference will be: <br />1. To review the initial progress schedule; <br />2. To establish a working understanding among the various parties associated or <br />affected by the Work;
The URL can be used to link to this page
Your browser does not support the video tag.