My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Interwest Construction Inc. 12/17/2025
>
Contracts
>
Capital Contract
>
Capital Construction Contracts and Change Orders
>
Interwest Construction Inc. 12/17/2025
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/17/2025 10:39:10 AM
Creation date
12/17/2025 10:24:02 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Interwest Construction Inc.
Approval Date
12/17/2025
Council Approval Date
12/10/2025
Department
Public Works
Department Project Manager
Amie Campbell
Subject / Project Title
Water Main Y, Phase 2
Tracking Number
0005048
Total Compensation
$2,020,202.02
Contract Type
Capital Contract
Contract Subtype
Capital Construction Contracts and Change Orders
Retention Period
10 Years Then Transfer to State Archivist
Imported from EPIC
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
591
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
CITY OF EVERETT SPECIAL PROVISIONS <br /> <br />Water Main Replacement “Y” – Ph 2 Div 1 – GEN REQUIREMENTS October 2025 <br />Work Order No. UP 3814 SP-104 <br />Category 2: Sensitive information <br />Category 2: For official use only / disclosure permissible by law. <br />will be present, and a survey crew may be required at the discretion of the Engineer. If <br />such work is the result of Contractor’s inability to complete work or coordinate materials, <br />equipment and labor in accordance with agreed schedule, then the City may deduct from <br />amounts due or to become due to the Contractor for the costs in excess of the straight- <br />time costs for employees and assistants of the City required to work overtime hours. <br />The Contractor by these specifications does hereby authorize the Engineer to deduct <br />such costs from the amount due or to become due to the Contractor. <br />1-08.1 Subcontracting <br />Delete 1-08.1(7)A Payment Certification and substitute the following: <br />On all projects funded only with City funds, the Contractor shall certify to the actual <br />amounts paid Disadvantaged, Minority, or Women’s Business Enterprise firms that were <br />used as subcontractors, lower tier subcontractors, manufacturers, regular dealers, or <br />service providers on the Contract. This certification shall be submitted to the Engineer <br />on WSDOT form 140-542 within 20 calendar days after physical completion of the <br />Contract. <br />Supplement 1-08.1 by adding the following: <br />The Contract Documents shall apply to Subcontractors and suppliers as if each had <br />signed the Contract with the City. Contractor shall include the provisions of these <br />Contract Documents or a “flow down” clause in each contract with Subcontractors and <br />suppliers. <br />The City will not approve a Subcontractor that is also providing services to the City on <br />the same project. <br />In addition to any other requirement in this Section, no Subcontractor or lower tier <br />subcontractor will be permitted to perform Work under the Contract until the following <br />documents have been completed and submitted to the Engineer: <br />1. Request to Sublet Work (Form 421-012), and <br />2. Contractor and Subcontractor or Lower Tier Subcontractor Certification for <br />Federal-aid Projects (Form 420-004). <br />The Contractor’s records pertaining to the requirements of this Special Provision shall <br />be open to inspection or audit by representatives of the City during the life of the Contract <br />and for a period of not less than three years after the date of acceptance of the Contract. <br />The Contractor shall retain these records for that period. The Contractor shall also <br />guarantee that these records of all Subcontractors and lower tier subcontractors shall <br />be available and open to similar inspection or audit for the same time period. <br />In addition to any other requirement in this Section, Contractor shall not sublet to a single <br />Subcontractor more than one-half of the Project. The City may refuse to approve any <br />subcontract for any reason. Subcontractors will be considered agents of the Contractor <br />and their work shall be subject to the provisions of the Contract. References in the <br />Contract Documents to actions required of Subcontractors, manufacturers, suppliers, or <br />any person other than the Contractor, the City or the City’s Representative shall be <br />interpreted as requiring that the Contractor shall require such Subcontractor, <br />manufacturer, supplier, or person to perform the specified action.
The URL can be used to link to this page
Your browser does not support the video tag.