My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Interwest Construction Inc. 12/17/2025
>
Contracts
>
Capital Contract
>
Capital Construction Contracts and Change Orders
>
Interwest Construction Inc. 12/17/2025
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/17/2025 10:39:10 AM
Creation date
12/17/2025 10:24:02 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Interwest Construction Inc.
Approval Date
12/17/2025
Council Approval Date
12/10/2025
Department
Public Works
Department Project Manager
Amie Campbell
Subject / Project Title
Water Main Y, Phase 2
Tracking Number
0005048
Total Compensation
$2,020,202.02
Contract Type
Capital Contract
Contract Subtype
Capital Construction Contracts and Change Orders
Retention Period
10 Years Then Transfer to State Archivist
Imported from EPIC
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
591
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
CITY OF EVERETT SPECIAL PROVISIONS <br /> <br />Water Main Replacement “Y” – Ph 2 Div 1 – GEN REQUIREMENTS October 2025 <br />Work Order No. UP 3814 SP-109 <br />Category 2: Sensitive information <br />Category 2: For official use only / disclosure permissible by law. <br />Contractor shall notify City’s Representative and City in writing and highlight the <br />addition of all activities to the schedule after the Preliminary Schedule. <br />The Baseline Schedule shall be part of the Contract. <br />Each activity shall be identified with a number that incorporates the Specification <br />section number. <br />Activities shall be consistent and identified with the Schedule of Values (if <br />applicable) or unit prices of the bid schedule. All elements and items in the Schedule <br />of Values or unit prices in the bid schedule shall appear in the Progress Schedules. <br />Contractor shall provide sub-schedules for each stage/phase of Work as required <br />by City, City’s Representative, or Subcontractor. <br />Contractor shall provide sub-schedules to define major portions of the entire <br />schedule. Include long-lead-time items for Equipment and material that requires <br />long fabrication time. Order these well in advance of required delivery time to <br />sequence with overall construction schedule. <br />Each schedule shall show accumulated percentage of completion of each activity, <br />and total percentage of Work completed, as of the date of payment application. <br />Contractor shall include in each schedule as activities the submission, review, and <br />correction of Submittals, Shop Drawings, Product Data and Samples. The schedule <br />should show: <br />1. The dates for Contractor's Submittals. <br />2. A minimum of 14 calendar days duration for City or City’s Representative’s <br />review. <br />3. Indicate decision data for selection of finishes. <br />4. Show Submittal preparation, submission, review, and breakdown at a <br />minimum. Show individual parts of major Submittals. <br />Contractor shall identify any and all Work furnished by City and installed by City on <br />the construction schedule. <br />1-08.3(4) Measurement <br />Delete 1-08.3(4). <br />1-08.3(5) Payment <br />Delete 1-08.3(5) and substitute the following: <br />Costs incurred in performance of this Work shall be included in the contract bid <br />items and no direct compensation shall be paid. <br />1-08.4 Prosecution of Work <br />Delete 1-08.4 and substitute the following: <br />1-08.4 Notice to Proceed and Prosecution of Work <br />(******) <br />The City will issue a Notice to Proceed after the Contract has been executed and the Contract <br />Bonds and evidence of insurance have been approved and filed by the City. Notice to <br />proceed shall not be issued by the City prior to Monday, March 23rd, 2026. The Contractor <br />shall not commence with the Work until the Notice to Proceed has been given by the City. <br />The Contractor shall commence construction activities on the Project site within 14 calendar <br />days of the Notice to Proceed Date, unless otherwise approved in writing. The Contractor <br />shall diligently pursue the Work to the Physical Completion Date within the time specified in <br />the Contract. Voluntary shutdown or slowing of operations by the Contractor shall not relieve
The URL can be used to link to this page
Your browser does not support the video tag.