My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Interwest Construction Inc. 12/17/2025
>
Contracts
>
Capital Contract
>
Capital Construction Contracts and Change Orders
>
Interwest Construction Inc. 12/17/2025
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/17/2025 10:39:10 AM
Creation date
12/17/2025 10:24:02 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Interwest Construction Inc.
Approval Date
12/17/2025
Council Approval Date
12/10/2025
Department
Public Works
Department Project Manager
Amie Campbell
Subject / Project Title
Water Main Y, Phase 2
Tracking Number
0005048
Total Compensation
$2,020,202.02
Contract Type
Capital Contract
Contract Subtype
Capital Construction Contracts and Change Orders
Retention Period
10 Years Then Transfer to State Archivist
Imported from EPIC
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
591
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
CITY OF EVERETT SPECIAL PROVISIONS <br /> <br />Water Main Replacement “Y” – Ph 2 Div 1 – GEN REQUIREMENTS October 2025 <br />Work Order No. UP 3814 SP-110 <br />Category 2: Sensitive information <br />Category 2: For official use only / disclosure permissible by law. <br />the Contractor of the responsibility to complete the Work within the time(s) specified in the <br />Contract. <br />The City is not obligated to accept or pay for Work performed by the Contractor or be liable <br />for any Delays, prior to delivery of the Notice to Proceed. The City’s knowledge of Work being <br />performed prior to delivery of the Notice to Proceed will not obligate the City to accept or pay <br />for such Work. Contractor waives any and all Contract Claims for an adjustment of Contract <br />Sum or Contract Time arising out of, or related to, Work it performs prior to receipt of the <br />Notice to Proceed. <br />The City may allow the Contractor to perform some Work prior to issuance to the Notice to <br />Proceed, such as shop drawings, equipment and material Submittals, or surveying and the <br />City or City’s Representative may, in its sole discretion, approve in writing such Work prior to <br />the issuance of the Notice to Proceed. <br />Supplement 1-08.4 by adding the following: <br />1-08.4(1) Construction Progress <br />(******) <br />The Contractor shall furnish all labor, materials, facilities, and Equipment necessary to <br />ensure the prosecution and completion of the Project within the interim milestones, <br />Substantial Completion, Physical Completion and Completion Dates of the Contract. If <br />Work falls seven calendar days or more behind the reviewed Preliminary Schedule, the <br />Contractor agrees that, at its sole cost and expense, it will take all actions necessary to <br />return the Project to the accepted schedule. These actions may include the following: <br />a. Increase labor in quantities and crafts. <br />b. Increase the number of working hours per shift, shifts per working day, working <br />days per week, or the amount of Equipment, or any combination of the <br />foregoing. <br />c. Reschedule activities. <br />If requested by the City’s Representative, the Contractor shall prepare a proposed <br />schedule revision demonstrating a plan to make up the lag in progress and ensure <br />completion of the Work within the Contract Time. All actions taken to return the Project <br />to the accepted schedule are at the Contractor's expense. <br />The Contractor shall pay all costs incurred by the City that result from the Contractor's <br />action to return the Project to its accepted schedule, including, but not limited to, <br />additional, overtime, or third party inspection, design and construction management <br />service costs. Contractor agrees that City shall deduct such charges from payments due <br />the Contractor. It is further understood and agreed that none of the services performed <br />by the City’s Representative in monitoring, reviewing, and reporting Project status and <br />progress shall relieve the Contractor of responsibility for planning and managing <br />construction Work in conformance with the construction schedule. <br />1-08.4(2) Special Construction Constraints <br />(******) <br />Refer to 1-08.0(2) for work hours. <br />Refer to 1-07.23(1) for construction under traffic and 1.07.23(1)A for general traffic <br />requirements. <br />Provide notice in accordance with 8-20.3(1) of these Special Provisions to City of Everett <br />Traffic Department before cutting induction loop wiring. <br />Pay particular attention to maximum length allowed between sampling points on new <br />water main in accordance with 7-09.3(24)H FINAL FLUSHING AND TESTING.
The URL can be used to link to this page
Your browser does not support the video tag.