My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Interwest Construction Inc. 12/17/2025
>
Contracts
>
Capital Contract
>
Capital Construction Contracts and Change Orders
>
Interwest Construction Inc. 12/17/2025
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/17/2025 10:39:10 AM
Creation date
12/17/2025 10:24:02 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Interwest Construction Inc.
Approval Date
12/17/2025
Council Approval Date
12/10/2025
Department
Public Works
Department Project Manager
Amie Campbell
Subject / Project Title
Water Main Y, Phase 2
Tracking Number
0005048
Total Compensation
$2,020,202.02
Contract Type
Capital Contract
Contract Subtype
Capital Construction Contracts and Change Orders
Retention Period
10 Years Then Transfer to State Archivist
Imported from EPIC
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
591
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
CITY OF EVERETT SPECIAL PROVISIONS <br /> <br />Water Main Replacement “Y” – Ph 2 Div 1 – GEN REQUIREMENTS October 2025 <br />Work Order No. UP 3814 SP-124 <br />Category 2: Sensitive information <br />Category 2: For official use only / disclosure permissible by law. <br />concurrently with the subject calculation for Unabsorbed and/or Extended <br />Home Office Overhead. The necessary adjustment would be to reduce the <br />Gross Amount of Additional Home Office Overhead Compensation by any <br />additional compensation for Overhead included in any direct cost claims being <br />resolved concurrently with any claim for Extended and/or Unabsorbed Home <br />Office Overhead. <br />Contractor shall not receive compensation for cost of use of equity capital. <br />Supplement 1-09.4 by adding the following: <br />1-09.4(3) COVID-19 Equitable Adjustments <br />Contractor’s Bid includes all costs necessary for the duration of the Work for compliance <br />with COVID-19 Requirements. Contractor’s Bid takes into account that COVID-19 <br />Requirements may create direct and indirect costs, including inefficiency and Delay. <br />Contractor shall have no entitlement to an equitable adjustment or other increase to the <br />Contract Sum for any direct or indirect costs (including without limitation Delay, <br />cumulative impact, inefficiency, or ripple costs) incurred by the Contractor to comply with <br />the COVID-19 Requirements. <br />1-09.5 Deleted or Terminated Work <br />Delete the first paragraph, beginning with “The Engineer may delete,” and the second <br />paragraph, beginning with “Payment for completed items,” and substitute the following: <br />The City’s Representative may delete Work as provided in 1-04.4 CHANGES or may <br />terminate the Contract in whole or part as provided in 1-08.10(2) TERMINATION FOR <br />PUBLIC CONVENIENCE. When the Contract is partially terminated for the City’s <br />convenience, the partial termination shall be treated as a deductive Change Order for <br />payment purposes under this section. <br />Payment for completed items will be at contract unit prices or pursuant to the Schedule <br />of Values. <br />Delete the fourth paragraph, beginning with “Contract time shall be,” and the fifth paragraph, <br />beginning with “Acceptable materials ordered by,” and substitute the following: <br />Acceptable materials ordered by the Contractor prior to the date the Work was <br />terminated or deleted will either be purchased from the Contractor by the City at the <br />actual cost and shall become the property of the City, or the City will reimburse the <br />Contractor for the actual costs of returning these materials to the suppliers. <br />If Contractor disagrees with the adjustment of Contract Sum determined by the City’s <br />Representative, Contractor may submit a Contract Claim for the difference between the <br />amount determined by the City’s Representative and the amount sought by the <br />Contractor. <br />Contractor shall not be entitled to any anticipated profits on deleted, terminated, or <br />uncompleted Work. <br />1-09.6 Force Account <br />Supplement 1-09.6 by adding the following: <br />The City has estimated and included in the Proposal dollar amounts for all items to be <br />paid per Force Account. This is done only to provide a common Bid for Bidders. All such <br />dollar amounts are to become a part of Contractor's total bid. However, the City does <br />not warrant expressly or by implication that the actual amount of Work will correspond <br />with those estimates. Payment will be made on the basis of the amount of Work actually <br />authorized by Engineer.
The URL can be used to link to this page
Your browser does not support the video tag.