My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Interwest Construction Inc. 12/17/2025
>
Contracts
>
Capital Contract
>
Capital Construction Contracts and Change Orders
>
Interwest Construction Inc. 12/17/2025
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/17/2025 10:39:10 AM
Creation date
12/17/2025 10:24:02 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Interwest Construction Inc.
Approval Date
12/17/2025
Council Approval Date
12/10/2025
Department
Public Works
Department Project Manager
Amie Campbell
Subject / Project Title
Water Main Y, Phase 2
Tracking Number
0005048
Total Compensation
$2,020,202.02
Contract Type
Capital Contract
Contract Subtype
Capital Construction Contracts and Change Orders
Retention Period
10 Years Then Transfer to State Archivist
Imported from EPIC
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
591
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
CITY OF EVERETT SPECIAL PROVISIONS <br /> <br />Water Main Replacement “Y” – Ph 2 Div 1 – GEN REQUIREMENTS October 2025 <br />Work Order No. UP 3814 SP-125 <br />Category 2: Sensitive information <br />Category 2: For official use only / disclosure permissible by law. <br />1-09.7 Mobilization <br />Supplement 1-09.7 by adding the following: <br />1. Construction Identification Signs: Upon commencement of Work, the Contractor shall <br />furnish and erect two Project/Construction Identification Signs in accordance with <br />COE Standard Drawing No. 714, one at each end of each work area at Engineer <br />approved locations. <br />a. Contractor shall provide sign painting, lettering, and detailing by a professional <br />sign maker with Engineer approval prior to placement on job site. <br />b. Contractor shall provide a Project Information Sign for each of the two <br />Project/Construction Identification Signs. Attach Project Information Sign to the <br />surface of the sign face in accordance with COE Standard Plan No. 714. The <br />Construction Identification Sign shall contain the following three lines of <br />information that the Engineer will provide: <br /> PROJECT NAME: <br />PROJECT FUNDING: <br />PROJECT COST: <br />c. Contractor shall maintain signs and sign frames in a clearly legible condition <br />throughout the progress of the Work and shall completely remove signs upon <br />project completion. Deliver signs to the City's storage area for future City use. <br />d. No separate payment for Project/Construction Identification Signs will be made. <br />All costs associated with this item shall be merged with the unit contract price <br />for “Mobilization.” <br />2. Engineer's Field Office: The Contractor shall provide an office for the use of the <br />Engineer that may be in conjunction or attached to the Contractor's field office. <br />Sanitary facilities shall be nearby. The location of the office shall be adjacent to the <br />project and at a location acceptable to the Contractor and the Engineer. The office <br />shall be equipped with a desk, layout table, chairs and telephone and suitable <br />lighting, air conditioning and heating. A telephone shall be installed for the sole use <br />of the Engineer. It shall be a separate unit with a different telephone number than the <br />Contractor's phone. Mutually agreeable measures for the security of the office shall <br />be arranged between the Contractor and Engineer. The Engineer's office shall be on- <br />site, connected to all utilities, and fully prepared for occupancy prior to release of the <br />first warrant to the Contractor. <br />a. All costs for the Engineer's office, including telephone service for local calls <br />only, shall be borne by the Contractor and shall be included in the mobilization <br />cost. <br />1-09.9 Payments <br />Delete 1-09.9 and substitute the following: <br />1-09.9 Payments to Contractors <br />(******) <br />1-09.9(1) Progress Payments <br />Contractor shall submit progress payment estimate for completed Work and material on <br />hand based upon acceptable Work performed during the previous period, or since the <br />last partial payment estimate was submitted. Submit progress payment estimate to City’s <br />Representative by the tenth day of each month, or by schedule mutually agreed upon in <br />writing by the Contractor and City’s Representative at the Pre-Construction Conference. <br />Contractor shall make initial progress estimate not later than 30 days after the Work
The URL can be used to link to this page
Your browser does not support the video tag.