My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Interwest Construction Inc. 12/17/2025
>
Contracts
>
Capital Contract
>
Capital Construction Contracts and Change Orders
>
Interwest Construction Inc. 12/17/2025
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/17/2025 10:39:10 AM
Creation date
12/17/2025 10:24:02 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Interwest Construction Inc.
Approval Date
12/17/2025
Council Approval Date
12/10/2025
Department
Public Works
Department Project Manager
Amie Campbell
Subject / Project Title
Water Main Y, Phase 2
Tracking Number
0005048
Total Compensation
$2,020,202.02
Contract Type
Capital Contract
Contract Subtype
Capital Construction Contracts and Change Orders
Retention Period
10 Years Then Transfer to State Archivist
Imported from EPIC
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
591
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
CITY OF EVERETT SPECIAL PROVISIONS <br /> <br />Water Main Replacement “Y” – Ph 2 Div 1 – GEN REQUIREMENTS October 2025 <br />Work Order No. UP 3814 SP-132 <br />Category 2: Sensitive information <br />Category 2: For official use only / disclosure permissible by law. <br />Full compliance by the Contractor with the provisions of this section is a contractual <br />condition precedent to the Contractor’s right to sue or seek any recovery against <br />the City in any legal proceeding. <br />1-09.11(2)B Contents <br />All Contract Claims filed by the Contractor shall be in writing, verified under penalty <br />of perjury by an officer or principal of the Contractor, and in sufficient detail to enable <br />the City’s Representative to ascertain the basis and amount of the Contract Claim. <br />All Contract Claims shall be submitted to the City's Representative. At a minimum, <br />each Contract Claim shall include: <br />1. A detailed factual statement of the Contract Claim for an adjustment to the <br />Contract Sum or Contract Time, if any, providing all necessary dates, <br />locations, and items of Work affected by the Contract Claim. <br />2. The dates of all facts related to the Contract Claim. <br />3. The name of each City’s individual, official, or employee involved in or <br />knowledgeable about the Contract Claim. <br />4. The specific provisions of the Contract that support the Contract Claim and <br />a statement of the reasons why such provisions support the Contract <br />Claim. <br />5. If the Contract Claim relates to a decision of the City’s Representative that <br />the Contract leaves to the City’s Representative’s discretion or as to which <br />the Contract provides that the City Representative’s decision is final, the <br />Contractor shall set out in detail all facts supporting its position relating to <br />the decision of the City’s Representative. <br />6. Identification of any documents and the substance of any oral <br />communications that support the Contract Claim. <br />7. Copies of any identified documents that support the Contract Claim, other <br />than City documents and documents previously furnished to the City by <br />the Contractor. Standard industry manuals may be incorporated by <br />reference. <br />8. If Contractor seeks an extension of Contract Time: <br />a. The specific amount of time, including days and dates, sought. <br />b. The specific reasons the Contractor believes an extension of <br />Contract Time should be granted, including, but not limited to, <br />compliance with the requirements of 1-08.3 PROGRESS <br />SCHEDULE and 1-08.8 EXTENSIONS OF TIME; and <br />c. The specific provisions of the Contract Documents under which <br />it is sought. <br />9. If Contractor seeks an increase in the Contract Sum, the exact amount <br />sought and a breakdown of that amount into the following categories: <br />a. Labor <br />b. Materials <br />c. Direct Equipment. The actual cost for each piece of equipment <br />for which a Contract Claim is made or in the absence of actual <br />cost, the rates established by the AGC/WSDOT Equipment <br />Rental Agreement that was in effect when the Work was <br />performed. In no case shall the amounts sought or paid for each <br />piece of equipment exceed the rates established by the
The URL can be used to link to this page
Your browser does not support the video tag.