Interwest Construction Inc. 12/17/2025
>
Contracts
>
Capital Contract
>
Capital Construction Contracts and Change Orders
>
Interwest Construction Inc. 12/17/2025
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/17/2025 10:39:10 AM
Creation date
12/17/2025 10:24:02 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Interwest Construction Inc.
Approval Date
12/17/2025
Council Approval Date
12/10/2025
Department
Public Works
Department Project Manager
Amie Campbell
Subject / Project Title
Water Main Y, Phase 2
Tracking Number
0005048
Total Compensation
$2,020,202.02
Contract Type
Capital Contract
Contract Subtype
Capital Construction Contracts and Change Orders
Retention Period
10 Years Then Transfer to State Archivist
Imported from EPIC
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
591
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
CITY OF EVERETT SPECIAL PROVISIONS <br /> <br />Water Main Replacement “Y” – Ph 2 Div 1 – GEN REQUIREMENTS October 2025 <br />Work Order No. UP 3814 SP-131 <br />Category 2: Sensitive information <br />Category 2: For official use only / disclosure permissible by law. <br />7. All other conditions required by law are satisfied. <br />For the purposes of retainage, the date of “completion of all work” is deemed to be the <br />same date as the date of Final Acceptance. <br />1-09.11 Disputes and Claims <br />Delete all of 1-09.11 and substitute the following: <br />1-09.11(1) Disputes <br />(******) <br />When a Dispute occurs during the Contract, the Contractor shall pursue resolution <br />through the City's Representative. The Contractor shall follow the procedure outlined in <br />section 1-09.11(2) CONTRACT CLAIMS herein and 1-08.3 PROGRESS SCHEDULE <br />and 1-08.8 EXTENSIONS OF TIME for issues regarding the schedule and Contract <br />Time. Timely and adequate Notice is a condition precedent to a Contract Claim. Timely <br />and complete submission of a Contract Claim is a condition precedent to any entitlement <br />by the Contractor to an adjustment of Contract Sum or Contract Time. Unless waived in <br />writing by the City, mediation is a condition precedent to the filing of any lawsuit, action <br />or proceeding that seeks to recover on a Contract Claim, whether in whole or in part. <br />The costs of any such mediation will be borne equally by the parties. Unless otherwise <br />agreed by the parties, the mediation shall take place in Everett, Washington. <br />1-09.11(2) Contract Claims <br />(******) <br />1-09.11(2)A General <br />If the Contractor requests or believes for any reason that it is entitled to adjustment <br />of Contract Sum or Contract Time, or if the Contractor has a Dispute with the City <br />and wants the City to take some action, or refrain from taking action, the Contractor <br />shall file a Contract Claim as provided in this section. A timely and complete <br />Contract Claim is a condition precedent to any entitlement by the Contractor to an <br />adjustment of Contract Sum or Contract Time. No Contract Claim shall be allowed <br />unless the Contractor has given Notice as required under the Contract Documents. <br />The Contractor waives any Contract Claim if: (a) Notice was not timely given; (b) <br />the City's Representative is not afforded reasonable access by the Contractor to <br />complete records, including, but not limited to, correspondence, job diaries, and <br />actual cost and additional time incurred; (c) a Contract Claim is not timely filed as <br />required by the Contract Documents; or (d) adequate, accurate, contemporaneous <br />and segregated supporting time and expense records are not kept and maintained. <br />The fact that the Contractor provided proper and timely Notice, provided a properly <br />filed Contract Claim, or provided the City’s Representative access to records of <br />actual cost, shall not in any way be construed as proving or substantiating the <br />validity of the Contract Claim. If the City determines the Contract Claim has merit in <br />whole or in part, the City’s Representative will make an adjustment of Contract Sum <br />or Contract Time required for the Work, or both. If the City’s Representative finds <br />the Contract Claim to be without merit, no adjustment will be made. <br />The Contractor shall keep full, complete, accurate and contemporaneous records <br />of the costs and additional time incurred for any Contract Claim. The Contractor <br />shall permit the City's Representative to have access to those records and any other <br />records as may be required by the City's Representative to determine the facts or <br />contentions involved in the Contract Claim. City is not obligated to respond to a <br />Contract Claim unless the Contractor is in full compliance with all the provisions of <br />the Contract Documents and the formal Contract Claim document has been <br />submitted
The URL can be used to link to this page
Your browser does not support the video tag.