My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Interwest Construction Inc. 12/17/2025
>
Contracts
>
Capital Contract
>
Capital Construction Contracts and Change Orders
>
Interwest Construction Inc. 12/17/2025
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/17/2025 10:39:10 AM
Creation date
12/17/2025 10:24:02 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Interwest Construction Inc.
Approval Date
12/17/2025
Council Approval Date
12/10/2025
Department
Public Works
Department Project Manager
Amie Campbell
Subject / Project Title
Water Main Y, Phase 2
Tracking Number
0005048
Total Compensation
$2,020,202.02
Contract Type
Capital Contract
Contract Subtype
Capital Construction Contracts and Change Orders
Retention Period
10 Years Then Transfer to State Archivist
Imported from EPIC
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
591
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
CITY OF EVERETT SPECIAL PROVISIONS <br /> <br />Water Main Replacement “Y” – Ph 2 Div 1 – GEN REQUIREMENTS October 2025 <br />Work Order No. UP 3814 SP-134 <br />Category 2: Sensitive information <br />Category 2: For official use only / disclosure permissible by law. <br />occurring months before. The parties desire to avoid litigation and the costs and expense <br />of claims and Disputes at the end of the Project. <br />Any Contract Claim for adjustment of Contract Sum or Contract Time, or any Dispute or <br />Contract Claim of any kind whatsoever, shall be submitted, if at all, to the City or City’s <br />Representative no later than 30 calendar days after Notice was first required to be given <br />by the Contractor as provided in 1-04.5 NOTICE BY THE CONTRACTOR. Failure to <br />submit a Contract Claim within the 30 calendar days of the date Notice was required <br />pursuant to 1-04.5 NOTICE BY THE CONTRACTOR constitutes a complete waiver of <br />and bar to the Contract Claim, and Contractor is estopped from later asserting a Contract <br />Claim or seeking any relief or remedy relating to the Dispute for which it failed to submit <br />a Claim. <br />Contractor may not sue, cross-claim, claim, or bring any action of any kind whatsoever <br />against the City on any Contract Claim or Dispute after the expiration of 180 calendar <br />days from Physical Completion. <br />1-09.11(4) COVID-19 Contract Claims: Baseline COVID-19 Requirements <br />(******) <br />Contractor shall in no event be entitled to assert a Contract Claim for increase to the <br />Contract Sum for any direct or indirect costs (including without limitation Delay, <br />cumulative impact, inefficiency, or ripple costs) incurred by the Contractor to comply with <br />the COVID-19 Requirements. <br />The Contractor shall be entitled to an extension of Contract Time for Delays to the extent <br />caused by COVID-19 Requirements. Extension of Contract Time shall be determined <br />pursuant to 1-08.8 EXTENSIONS OF TIME. This Contract Time extension is the <br />Contractor’s sole remedy if the Contract Time in the Contract Documents is insufficient <br />to complete the Work because of Baseline COVID-19 Requirements. <br />All other Contract Claims regarding COVID-19 are governed by Section 1-09.11A(3)D1 <br />CAUSED SOLELY BY THIRD PARTIES OR FORCE MAJEURE, including 4 without <br />limitation Contract Claims relating to unavailable or delayed labor, materials, equipment <br />or subcontractors to the extent caused by COVID-19. <br />Supplement Section 1-09 by adding the following: <br />1-09.11A Remedies <br />(******) <br />1-09.11A(1) General <br />If a Contract Claim has merit in whole or in part, then Contractor’s sole remedies shall <br />be those provided in this subsection. Contractor shall timely and strictly comply with the <br />requirements of 1-04.5 NOTICE BY THE CONTRACTOR and 1-09.11(2) CONTRACT <br />CLAIMS and all other Contract Documents relating to the Contract Claim. Adjustments <br />to Contract Time shall be determined pursuant to 1-08.3 PROGRESS SCHEDULE and <br />1-08.8 EXTENSIONS OF TIME. Failure to comply strictly and timely shall be deemed a <br />waiver of the Contract Claim. <br />1-09.11A(2) Extra Work <br />1-09.11A(2)A Adjustment of Contract Sum <br />If the Contractor is entitled to an adjustment of Contract Sum because of Extra <br />Work, the adjustment shall be calculated and paid as provided in 1-09.4 <br />EQUITABLE ADJUSTMENT. This amount includes jobsite and home office <br />Overheads for such Work, including any schedule delays relating to such Work. <br />Therefore, no compensation in addition to that provided in 1-09.6 FORCE <br />ACCOUNT shall be paid for such things as Extended Overhead or other costs or <br />damages.
The URL can be used to link to this page
Your browser does not support the video tag.