My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Interwest Construction Inc. 12/17/2025
>
Contracts
>
Capital Contract
>
Capital Construction Contracts and Change Orders
>
Interwest Construction Inc. 12/17/2025
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/17/2025 10:39:10 AM
Creation date
12/17/2025 10:24:02 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Interwest Construction Inc.
Approval Date
12/17/2025
Council Approval Date
12/10/2025
Department
Public Works
Department Project Manager
Amie Campbell
Subject / Project Title
Water Main Y, Phase 2
Tracking Number
0005048
Total Compensation
$2,020,202.02
Contract Type
Capital Contract
Contract Subtype
Capital Construction Contracts and Change Orders
Retention Period
10 Years Then Transfer to State Archivist
Imported from EPIC
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
591
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
CITY OF EVERETT SPECIAL PROVISIONS <br /> <br />Water Main Replacement “Y” – Ph 2 Div 1 – GEN REQUIREMENTS October 2025 <br />Work Order No. UP 3814 SP-135 <br />Category 2: Sensitive information <br />Category 2: For official use only / disclosure permissible by law. <br />1-09.11A(2)B Extension of Contract Time <br />Extensions of Contract Time caused by Extra Work shall be determined as provided <br />in 1-08.3 PROGRESS SCHEDULE and 1-08.8 EXTENSIONS OF TIME. <br />1-09.11A(3) Delays <br />1-09.11A(3)A City Caused Delay Unrelated to Extra Work <br />1-09.11A(3)A1 Adjustment of Contract Sum <br />If the Contractor is entitled to an adjustment of Contract Sum because of a <br />Delay solely caused by the City that does not relate to Extra Work, Contractor <br />shall only be compensated for the items below, less all funds paid pursuant to <br />any change in the Contract Sum that contributed to the Delay: <br />1. Documented, incurred cost of nonproductive field supervision or labor <br />extended because of the Delay; <br />2. Documented, incurred cost of home office supervision to attend <br />jobsite meetings; <br />3. Documented, incurred cost of temporary facilities or equipment rental <br />extended because of the Delay; <br />4. Documented, incurred cost of insurance extended because of the <br />Delay; <br />5. General and administrative overhead in an amount to be agreed <br />upon, but not to exceed three percent of original Contract Sum divided <br />by the Contract Time for each day of the Delay. <br />City shall not owe Contractor compensation for Extended Overhead or other <br />delay costs to the extent Contractor or anyone other than the City contributed <br />to or is concurrently responsible for the Delay. <br />1-09.11A(3)A2 Adjustment of Contract Time <br />If the Contractor is entitled to an adjustment of Contract Time because of a <br />Delay solely caused by the City that does not relate to Extra Work, Contractor <br />shall be entitled to an adjustment of Contract Time to the extent the Delay <br />increases the duration of the Project, as measured by the critical path and as <br />demonstrated pursuant to the requirements of 1-08.8 EXTENSIONS OF TIME. <br />1-09.11A(3)B Contractor Caused Delay <br />If the Contractor is solely responsible for any Delay to any interim milestone, <br />Substantial Completion, Physical Completion, or the Completion Date, the City shall <br />be entitled to liquidated or other damages as provided elsewhere in the Contract <br />Documents. The Contractor accepts the risk of any Delays caused by strikes, work <br />slowdowns, job actions and labor unrest of any kind. Contractor shall not be entitled <br />to any increase in Contract Sum or Contract Time due to a Delay it caused. <br />1-09.11A(3)C Delays Concurrently Caused by Contractor and City <br />If the City and the Contractor cause a Delay concurrently, neither the City nor the <br />Contractor shall be liable to the other except as provided herein. <br />1-09.11A(3)C1 Adjustment of Contract Sum <br />The Contractor shall not be entitled to any adjustment in Contract Sum for <br />Delays concurrently caused by the City and the Contractor.