Interwest Construction Inc. 12/17/2025
>
Contracts
>
Capital Contract
>
Capital Construction Contracts and Change Orders
>
Interwest Construction Inc. 12/17/2025
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/17/2025 10:39:10 AM
Creation date
12/17/2025 10:24:02 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Interwest Construction Inc.
Approval Date
12/17/2025
Council Approval Date
12/10/2025
Department
Public Works
Department Project Manager
Amie Campbell
Subject / Project Title
Water Main Y, Phase 2
Tracking Number
0005048
Total Compensation
$2,020,202.02
Contract Type
Capital Contract
Contract Subtype
Capital Construction Contracts and Change Orders
Retention Period
10 Years Then Transfer to State Archivist
Imported from EPIC
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
591
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
CITY OF EVERETT SPECIAL PROVISIONS <br /> <br />Water Main Replacement “Y” – Ph 2 Div 2 – EARTHWORK October 2025 <br />Work Order No. UP 3814 SP-149 <br />Category 2: Sensitive information <br />Category 2: For official use only / disclosure permissible by law. <br />of rigid materials. Remove the entire curb and gutter section, regardless of material <br />composition. <br />2-02.3(3)C1 Sawcutting <br />Make vertical full depth saw cut between existing curb or curb and gutter to <br />remain and the portion to be removed. <br />2-02.3(3)D Removal of Cement Concrete Sidewalks <br />Concrete slabs that average four-inches or less in thickness will be considered as <br />sidewalk removal. <br />Protect existing concrete walk that is to remain in place, from equipment damage <br />by using planking or cover with rock free eight-inch thick blanket of excavated soil. <br />Provide Engineer with proposed pavement breakers before use and do not begin <br />breaking pavement without Engineer’s approval of the pavement breakers. <br />2-02.3(3)D1 Sawcutting <br />Make vertical full depth saw cut between existing cement concrete sidewalk to <br />remain and the portion to be removed at the nearest scribe marks beyond the <br />neat line limits, or to the nearest joint. <br />No diagonal cuts in sidewalk will be allowed unless otherwise indicated on the <br />Plans or directed by the Engineer. <br />2-02.3(3)E Removal of Catch Basins, Manholes, Inlets or Sumps <br />Excavate and completely remove the structure including, but not limited to, casting <br />and outlet trap, concrete encasement, and bricks, as applicable to each removal <br />item listed in the Proposal. <br />Plug existing connecting pipes that remain by filling with Commercial Concrete a <br />minimum length of 24–inches into the pipe. Backfill shall be Gravel Borrow as <br />specified in 9-03.14(1). Compact backfill to a minimum of 95 percent maximum <br />density in accordance with 2-03.3(14)D. <br />Supplement 2-02.3 by adding the following sections: <br />2-02.3(4) Obliteration of Pavement Markings <br />(******) <br />Remove pavement markings where shown on the Plans or where designated by the <br />Engineer. Obliterate pavement marking until blemishes caused by the pavement <br />marking removal conform to the coloration of the adjacent pavement. If the pavement is <br />materially damaged by pavement marking removal operation, Contractor shall repair the <br />pavement damage, at the Contractor's expense, to a condition equal to existing <br />pavement that had no markings obliterated. Remove sand or other material deposited <br />on the pavement as a result of removing stripes and markings as the Work progresses <br />to avoid hazardous conditions. Accumulation of sand or other material that might <br />interfere with drainage will not be permitted. <br />2-02.3(5) Abandon Pipe In-place <br />(******) <br />Plug pipe ends of pipes designated on Plans being abandoned in-place using <br />commercial concrete. If designated on Plans, fill abandoned in-place pipe with <br />Controlled Density Fill as specified in 2-09.3(1)E. <br />Where asbestos-cement pipe is encountered and necessary to move for proposed <br />improvements, all work shall conform to requirements specified in 1-07.5(4)C and 2- <br />02.1. The pipe shall be buried in place within the same trench, clear of proposed pipe <br />and fitting bedding zone, without transporting hazardous materials off-site. The