Laserfiche WebLink
CITY OF EVERETT SPECIAL PROVISIONS <br /> <br />Water Main Replacement “Y” – Ph 2 Div 2 – EARTHWORK October 2025 <br />Work Order No. UP 3814 SP-153 <br />Category 2: Sensitive information <br />Category 2: For official use only / disclosure permissible by law. <br />There will be no direct compensation made for haul on material moved within or from <br />the Project site and the Contractor shall include the cost of hauling in his various unit <br />contract prices. <br />There will be no direct compensation made for “Proof Rolling” as required in this section <br />for excavated portions of the roadway and the Contractor shall include costs in his <br />various unit Contract prices. <br />Payment for over excavation below subgrade and disposal of over excavated materials <br />as required in this section shall be included in the Bid item for Foundation Material. <br />Imported material required in this section shall be paid for by the unit Bid price for that <br />material. Payment for placement and compaction of import material shall be included in <br />the unit price per ton of import material. <br /> <br />2-04 HAUL <br />2-04.1 Description <br />Delete the first paragraph of 2-04.1 and substitute the following: <br />This Work shall consist of transporting excavated material from its original site to its final <br />place on the Project or to a Contractor arranged waste site. <br />2-04.3 Vacant <br />Revise 2-04.3 to read as follows: <br />2-04.3 Construction Requirements <br />Off-highway earth-moving equipment shall not haul on or across streets, roadways, <br />driveways, trails, sidewalks, or parking lots not being improved in the Contract. <br />2-04.4 Measurement <br />Revise 2-04.4 to read as follows: <br />Haul work will not be measured. <br />2-04.5 Payment <br />Revise 2-04.5 to read as follows: <br />All costs for the Work described in Section 2-04 shall be included with excavation work <br />with no direct compensation made. <br /> <br />2-07 WATERING <br />2-07.3 Construction Requirements <br />Supplement 2-07.3 by adding the following: <br />Only Everett Public Works Department Water Division personnel and the Project <br />Inspector may authorize the operation of City fire hydrants or making connections to City <br />water mains. Upon obtaining City permission, the following shall apply: <br />1. Use only those agency designated hydrants in strict accordance with City’s <br />requirements for hydrant use. Obtain a temporary hydrant permit from the <br />City’s Public Works Department Water Division. Temporary hydrant permits are <br />available for a $1,200.00 deposit by contacting the City of Everett’s Utility Billing <br />at 425-257-8999 from 8:00 a.m. to 5:00 p.m. Monday through Friday. Deposit <br />is refundable. Provide backflow prevention assembly approved by the City.