My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Interwest Construction Inc. 12/17/2025
>
Contracts
>
Capital Contract
>
Capital Construction Contracts and Change Orders
>
Interwest Construction Inc. 12/17/2025
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/17/2025 10:39:10 AM
Creation date
12/17/2025 10:24:02 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Interwest Construction Inc.
Approval Date
12/17/2025
Council Approval Date
12/10/2025
Department
Public Works
Department Project Manager
Amie Campbell
Subject / Project Title
Water Main Y, Phase 2
Tracking Number
0005048
Total Compensation
$2,020,202.02
Contract Type
Capital Contract
Contract Subtype
Capital Construction Contracts and Change Orders
Retention Period
10 Years Then Transfer to State Archivist
Imported from EPIC
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
591
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
CITY OF EVERETT SPECIAL PROVISIONS <br /> <br />Water Main Replacement “Y” – Ph 2 Div 2 – EARTHWORK October 2025 <br />Work Order No. UP 3814 SP-154 <br />Category 2: Sensitive information <br />Category 2: For official use only / disclosure permissible by law. <br />2. Secure permission from and comply with all requirements of the City’s water <br />utility before obtaining water from the fire hydrants. Notify the Engineer of City’s <br />permission as soon as granted. <br />3. Use hydrant wrenches only to open hydrants. Make certain the hydrant valve <br />is fully open because “cracking” the hydrant valve causes damage to the <br />hydrant valve. Provide an approved auxiliary valve on the outlet line for control <br />purposes. Close fire hydrant valves slowly to avoid a surge in the system that <br />creates excess pressure on water lines. Carefully note the importance of <br />following these directions. <br />4. If Contractor's employees use the wrong wrench to open a hydrant causing <br />damage the hydrant valve stem or operating nut or both, the Contractor shall <br />be responsible for costs associated with repairing the damaged hydrant valve <br />stem or operating nut or both. Immediately notify the City’s water utility so that <br />the damage can be repaired as quickly as possible. <br />5. Notify City water utility immediately upon completing the use of the hydrants so <br />the hydrants may be inspected for possible damage. City water utility will repair <br />damage resulting from the use of the hydrants by the Contractor. Contractor <br />shall be responsible for repair cost and cost, if necessary, shall be withheld <br />from the final payment to the Contractor. <br />6. City water utility will fine Contractor for violation of these requirements. <br />Contractor shall also be liable for damage suits resulting from malfunctioning <br />of Contractor damaged fire hydrants not being operational in the event of fire. <br />7. There will be no charge for the volume of water used. <br />2-07.4 Measurement <br />Revise 2-07.4 to read as follows: <br />Water will not be measured. <br />2-07.5 Payment <br />Revise 2-07.5 to read as follows: <br />All costs for the Work described in Section 2-07 shall be included with the Work with no <br />direct compensation made. <br /> <br />2-09 STRUCTURE EXCAVATION <br />2-09.2 Materials <br />Supplement 2-09.2 by adding the following at end of the materials list: <br />Foundation Material Class A or B 9-03.17 Standard Specifications <br />Controlled Density Fill 2-09.3(1)E Special Provisions <br />2-09.3 Construction Requirements <br />2-09.3(1) General Requirements <br />2-09.3(1)C Removal of Unstable Base Material <br />Delete all paragraphs in 2-09.3(1)C and substitute the following: <br />When the material at the bottom of an excavation is not stable enough to <br />support the Structure, the Contractor shall excavate below grade to the depth <br />required by the Engineer and replace the unstable material with Foundation <br />Material Class A or B.
The URL can be used to link to this page
Your browser does not support the video tag.