My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Interwest Construction Inc. 12/17/2025
>
Contracts
>
Capital Contract
>
Capital Construction Contracts and Change Orders
>
Interwest Construction Inc. 12/17/2025
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/17/2025 10:39:10 AM
Creation date
12/17/2025 10:24:02 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Interwest Construction Inc.
Approval Date
12/17/2025
Council Approval Date
12/10/2025
Department
Public Works
Department Project Manager
Amie Campbell
Subject / Project Title
Water Main Y, Phase 2
Tracking Number
0005048
Total Compensation
$2,020,202.02
Contract Type
Capital Contract
Contract Subtype
Capital Construction Contracts and Change Orders
Retention Period
10 Years Then Transfer to State Archivist
Imported from EPIC
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
591
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
CITY OF EVERETT SPECIAL PROVISIONS <br /> <br />Water Main Replacement “Y” – Ph 2 Div 2 – EARTHWORK October 2025 <br />Work Order No. UP 3814 SP-155 <br />Category 2: Sensitive information <br />Category 2: For official use only / disclosure permissible by law. <br />Place Foundation Material Class A or B in layers not more than six inches thick <br />and compact to minimum of 90-percent maximum density as determined by 2- <br />03.3(14)D. <br />Dispose of unsuitable material removed to make room for foundation material <br />by hauling to a waste site obtained and provided by the Contractor in <br />accordance with 2-03.3(7)C. <br />2-09.3(1)D Disposal of Excavated Material <br />Delete the second paragraph in 2-09.3(1)D and substitute the following: <br />All costs for disposing of excavated material, whether within the Project limits <br />or hauled to a disposal site, shall be incidental to the other Bid items in the <br />Proposal. The City will not pay for hauling. Disposal of excavated material shall <br />meet the requirements of 2-03.3(7)C. <br />2-09.3(1)E Backfilling <br />Delete the fourth paragraph in 2-09.3(1)E and substitute the following: <br />Provide CDF having minimum 28-day strength of 50 psi and maximum 28-day <br />strength not to exceed 300-psi. Provide wet or flowable CDF with consistency <br />having approximate slump between three to ten inches. <br />Controlled Density Fill used for excavation backfill may be placed dry or wet. <br />Use wet, or flowable, CDF for filling abandoned pipes in-place. <br />Supplement 2-09.3(1)E by adding the following: <br />Where CDF is used in lieu of other materials such as foundation material, <br />gravel borrow, washed sand or crushed surfacing top course, the respective <br />limits for trench width or backfill dimensions shall be approved by the Inspector. <br />2-09.3(3)B Excavation Using Open Pits – Extra Excavation <br />Revise the sixth paragraph to read as follows: <br />Submittals and Design Requirements – The Contractor shall submit Type 3E <br />Working Drawings with supporting calculations showing the geometry and <br />construction sequencing of the proposed excavation slopes. <br />2-09.3(3)D Shoring and Cofferdams <br />Revise the fifth paragraph to read as follows: <br />Submittals and Design Requirements – The Contractor shall submit Type 3E <br />Working Drawings with supporting calculations showing the proposed methods <br />and construction details of structural shoring or cofferdams in accordance with <br />Sections 1-05.3 and 6-02.3(16). <br />2-09.4 Measurement <br />Delete all paragraphs in 2-09.4 and substitute the following: <br />Bid items of Work completed pursuant to the Contract Documents will be measured as <br />described in Division B – Bid Item Descriptions of these Special Provisions and Section <br />1-09 MEASUREMENT AND PAYMENT of the Standard Specifications. <br />2-09.5 Payment <br />Delete all paragraphs in 2-09.5 and substitute the following: <br />Payment for bid items of Work completed pursuant to the Contract Documents will be <br />as described in Division B – Bid Item Descriptions of these Special Provisions and <br />Section 1-09 MEASUREMENT AND PAYMENT of the Standard Specifications.
The URL can be used to link to this page
Your browser does not support the video tag.