Laserfiche WebLink
CITY OF EVERETT SPECIAL PROVISIONS <br /> <br />Water Main Replacement “Y” – Ph 2 Div 2 – EARTHWORK October 2025 <br />Work Order No. UP 3814 SP-155 <br />Category 2: Sensitive information <br />Category 2: For official use only / disclosure permissible by law. <br />Place Foundation Material Class A or B in layers not more than six inches thick <br />and compact to minimum of 90-percent maximum density as determined by 2- <br />03.3(14)D. <br />Dispose of unsuitable material removed to make room for foundation material <br />by hauling to a waste site obtained and provided by the Contractor in <br />accordance with 2-03.3(7)C. <br />2-09.3(1)D Disposal of Excavated Material <br />Delete the second paragraph in 2-09.3(1)D and substitute the following: <br />All costs for disposing of excavated material, whether within the Project limits <br />or hauled to a disposal site, shall be incidental to the other Bid items in the <br />Proposal. The City will not pay for hauling. Disposal of excavated material shall <br />meet the requirements of 2-03.3(7)C. <br />2-09.3(1)E Backfilling <br />Delete the fourth paragraph in 2-09.3(1)E and substitute the following: <br />Provide CDF having minimum 28-day strength of 50 psi and maximum 28-day <br />strength not to exceed 300-psi. Provide wet or flowable CDF with consistency <br />having approximate slump between three to ten inches. <br />Controlled Density Fill used for excavation backfill may be placed dry or wet. <br />Use wet, or flowable, CDF for filling abandoned pipes in-place. <br />Supplement 2-09.3(1)E by adding the following: <br />Where CDF is used in lieu of other materials such as foundation material, <br />gravel borrow, washed sand or crushed surfacing top course, the respective <br />limits for trench width or backfill dimensions shall be approved by the Inspector. <br />2-09.3(3)B Excavation Using Open Pits – Extra Excavation <br />Revise the sixth paragraph to read as follows: <br />Submittals and Design Requirements – The Contractor shall submit Type 3E <br />Working Drawings with supporting calculations showing the geometry and <br />construction sequencing of the proposed excavation slopes. <br />2-09.3(3)D Shoring and Cofferdams <br />Revise the fifth paragraph to read as follows: <br />Submittals and Design Requirements – The Contractor shall submit Type 3E <br />Working Drawings with supporting calculations showing the proposed methods <br />and construction details of structural shoring or cofferdams in accordance with <br />Sections 1-05.3 and 6-02.3(16). <br />2-09.4 Measurement <br />Delete all paragraphs in 2-09.4 and substitute the following: <br />Bid items of Work completed pursuant to the Contract Documents will be measured as <br />described in Division B – Bid Item Descriptions of these Special Provisions and Section <br />1-09 MEASUREMENT AND PAYMENT of the Standard Specifications. <br />2-09.5 Payment <br />Delete all paragraphs in 2-09.5 and substitute the following: <br />Payment for bid items of Work completed pursuant to the Contract Documents will be <br />as described in Division B – Bid Item Descriptions of these Special Provisions and <br />Section 1-09 MEASUREMENT AND PAYMENT of the Standard Specifications.