Interwest Construction Inc. 12/17/2025
>
Contracts
>
Capital Contract
>
Capital Construction Contracts and Change Orders
>
Interwest Construction Inc. 12/17/2025
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/17/2025 10:39:10 AM
Creation date
12/17/2025 10:24:02 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Interwest Construction Inc.
Approval Date
12/17/2025
Council Approval Date
12/10/2025
Department
Public Works
Department Project Manager
Amie Campbell
Subject / Project Title
Water Main Y, Phase 2
Tracking Number
0005048
Total Compensation
$2,020,202.02
Contract Type
Capital Contract
Contract Subtype
Capital Construction Contracts and Change Orders
Retention Period
10 Years Then Transfer to State Archivist
Imported from EPIC
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
591
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
CITY OF EVERETT SPECIAL PROVISIONS <br /> <br />Water Main Replacement “Y” – Ph 2 Div 5 – SURF TREATMTS & PVMTS October 2025 <br />Work Order No. UP 3814 SP-163 <br />Category 2: Sensitive information <br />Category 2: For official use only / disclosure permissible by law. <br />Provide HMA paver in good condition and have the most current equipment <br />available from the manufacturer for the prevention of segregation of the HMA <br />mixture installed in good condition and in working order. Provide equipment <br />certification listing the make, model, and year of the paver and note retrofitting of <br />any equipment. <br />Operate the screed in accordance with the manufacturer’s recommendations and <br />so it effectively produces a finished surface of the required evenness and texture <br />without tearing, shoving, segregating, or gouging the mixture. Provide a copy of the <br />manufacturer’s recommendations upon City’s request. Extensions producing the <br />same results, including ride, density, and surface texture as obtained by the primary <br />screed will be allowed. Do NOT use extensions without augers and an internally <br />heated vibratory screed in the Traveled Way. <br />When specified in the Contract, reference lines for vertical control will be required. <br />Place lines on both outer edges of the Traveled Way of each Roadway. Horizontal <br />control utilizing the reference line will be permitted. Control the grade and slope for <br />intermediate lanes automatically from reference lines or by means of a mat <br />referencing device and a slope control device. When the finish of the grade <br />prepared for paving is superior to the established tolerances and when, in the <br />opinion of the Engineer, further improvement to the line, grade, cross-section, and <br />smoothness can best be achieved without the use of the reference line, a mat <br />referencing device may be substituted for the reference line. Substitution of the <br />device will be subject to the continued approval of the Engineer. A joint matcher may <br />be used subject to the approval of the Engineer. The reference line may be removed <br />after the completion of the first course of HMA when approved by the Engineer. <br />Whenever the Engineer determines that any of these methods are failing to provide <br />the necessary vertical control, the reference lines will be reinstalled by the <br />Contractor. <br />Furnish and install all pins, brackets, tensioning devices, wire, and accessories <br />necessary for satisfactory operation of the automatic control equipment. <br />If the paving machine in use is not providing the required finish, the Engineer may <br />suspend Work as allowed by Section 1-08.6. Thoroughly remove any cleaning or <br />solvent type liquids spilled on the pavement before paving proceeds. <br />5-04.3(3)D Material Transfer Device or Material Transfer Vehicle <br />Provide a Material Transfer Device/Vehicle (MTD/V) with the Engineer’s approval, <br />unless otherwise required by the Contract. <br />Where an MTD/V is required by the contract, the Engineer may approve paving <br />without an MTD/V, at the Contractor’s request. The Engineer will determine if an <br />equitable adjustment in cost or time is due. <br />Mix the MTD/V when used with the HMA after delivery by the hauling equipment <br />and prior to laydown by the paving machine. Sufficiently mix the HMA to obtain a <br />uniform temperature throughout the mixture. The length of the windrow for windrow <br />elevator may be limited in urban areas or through intersections at the discretion of <br />the Engineer. <br />To be approved for use, provide an MTV meeting the following: <br />1. Self-propelled vehicle, separate from the hauling vehicle or paver. <br />2. Not be connected to the hauling vehicle or paver. <br />3. May accept HMA directly from the haul vehicle or pick up HMA from a <br />windrow.