Laserfiche WebLink
CITY OF EVERETT SPECIAL PROVISIONS <br /> <br />Water Main Replacement “Y” – Ph 2 Div 5 – SURF TREATMTS & PVMTS October 2025 <br />Work Order No. UP 3814 SP-164 <br />Category 2: Sensitive information <br />Category 2: For official use only / disclosure permissible by law. <br />4. Ability to mix the HMA after delivery by the hauling equipment and prior to <br />placement into the paving machine. <br />5. Ability to mix the HMA sufficiently to obtain a uniform temperature <br />throughout the mixture. <br />To be approved for use, provide an MTD meeting the following: <br />1. Ability to be positively connected to the paver. <br />2. May accept HMA directly from the haul vehicle or pick up HMA from a <br />windrow. <br />3. Ability to mix the HMA after delivery by the hauling equipment and prior to <br />placement into the paving machine. <br />4. Ability to mix the HMA sufficiently to obtain a uniform temperature <br />throughout the mixture. <br />5-04.3(3)E Rollers <br />Provide vibratory, oscillatory steel wheel rollers, or pneumatic tire type rollers, in <br />good condition and capable of reversing without backlash. Operate roller in <br />accordance with the manufacturer’s recommendations. When ordered by the <br />Engineer for any roller planned for use on the project, provide a copy of the <br />manufacturer’s recommendation for the use of that roller for compaction of HMA. <br />Provide sufficient number and weight of rollers to compact the mixture in compliance <br />with the requirements of Section 5-04.3(10). The use of equipment that results in <br />crushing of the aggregate will not be permitted. Rollers producing pickup, <br />washboard, uneven compaction of the surface, displacement of the mixture or other <br />undesirable results will not be permitted. <br />5-04.3(4) Preparation of Existing Paved Surfaces <br />Bring any irregular existing pavement surface or old base surface to a uniform grade <br />and cross-section as shown on the Plans or approved by the Engineer. <br />Accomplish preleveling of uneven or broken surfaces over which HMA is to be placed <br />by using an asphalt paver, a motor patrol grader, or by hand raking, as approved by the <br />Engineer. <br />Provide compaction of preleveling HMA to the satisfaction of the Engineer and may <br />require the use of small steel wheel rollers, plate compactors, or pneumatic rollers to <br />avoid bridging across preleveled areas by the compaction equipment. Provide Engineer <br />approved compaction equipment used for the compaction of preleveling HMA. <br />Clean the entire surface of the pavement before construction of HMA on an existing <br />paved surface. Entirely remove all fatty asphalt patches, grease drippings, and other <br />objectionable matter from the existing pavement. Thoroughly clean all pavements or <br />bituminous surfaces of dust, soil, pavement grindings, and other foreign matter. Fill all <br />holes and small depressions with an appropriate class of HMA. Level and thoroughly <br />compact the patched area surface. Obtain Engineer approval of the surface prior to the <br />application of tack coat or paving. <br />Apply an asphalt tack coat to all paved surfaces that HMA is to be placed or abutted; <br />except, that tack coat may be omitted from clean, newly paved surfaces at the <br />Engineer’s discretion. Uniformly apply tack coat to cover the existing pavement with a <br />thin film of residual asphalt free of streaks and bare spots at a rate between 0.02 and <br />0.10 gallons per square yard of retained asphalt. Obtain application rate approval from <br />Engineer. Apply a heavy application of tack coat to all joints. For Roadways open to <br />traffic, limit the application of tack coat to surfaces that will be paved during the same