My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Interwest Construction Inc. 12/17/2025
>
Contracts
>
Capital Contract
>
Capital Construction Contracts and Change Orders
>
Interwest Construction Inc. 12/17/2025
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/17/2025 10:39:10 AM
Creation date
12/17/2025 10:24:02 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Interwest Construction Inc.
Approval Date
12/17/2025
Council Approval Date
12/10/2025
Department
Public Works
Department Project Manager
Amie Campbell
Subject / Project Title
Water Main Y, Phase 2
Tracking Number
0005048
Total Compensation
$2,020,202.02
Contract Type
Capital Contract
Contract Subtype
Capital Construction Contracts and Change Orders
Retention Period
10 Years Then Transfer to State Archivist
Imported from EPIC
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
591
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
CITY OF EVERETT SPECIAL PROVISIONS <br /> <br />Water Main Replacement “Y” – Ph 2 Div 5 – SURF TREATMTS & PVMTS October 2025 <br />Work Order No. UP 3814 SP-164 <br />Category 2: Sensitive information <br />Category 2: For official use only / disclosure permissible by law. <br />4. Ability to mix the HMA after delivery by the hauling equipment and prior to <br />placement into the paving machine. <br />5. Ability to mix the HMA sufficiently to obtain a uniform temperature <br />throughout the mixture. <br />To be approved for use, provide an MTD meeting the following: <br />1. Ability to be positively connected to the paver. <br />2. May accept HMA directly from the haul vehicle or pick up HMA from a <br />windrow. <br />3. Ability to mix the HMA after delivery by the hauling equipment and prior to <br />placement into the paving machine. <br />4. Ability to mix the HMA sufficiently to obtain a uniform temperature <br />throughout the mixture. <br />5-04.3(3)E Rollers <br />Provide vibratory, oscillatory steel wheel rollers, or pneumatic tire type rollers, in <br />good condition and capable of reversing without backlash. Operate roller in <br />accordance with the manufacturer’s recommendations. When ordered by the <br />Engineer for any roller planned for use on the project, provide a copy of the <br />manufacturer’s recommendation for the use of that roller for compaction of HMA. <br />Provide sufficient number and weight of rollers to compact the mixture in compliance <br />with the requirements of Section 5-04.3(10). The use of equipment that results in <br />crushing of the aggregate will not be permitted. Rollers producing pickup, <br />washboard, uneven compaction of the surface, displacement of the mixture or other <br />undesirable results will not be permitted. <br />5-04.3(4) Preparation of Existing Paved Surfaces <br />Bring any irregular existing pavement surface or old base surface to a uniform grade <br />and cross-section as shown on the Plans or approved by the Engineer. <br />Accomplish preleveling of uneven or broken surfaces over which HMA is to be placed <br />by using an asphalt paver, a motor patrol grader, or by hand raking, as approved by the <br />Engineer. <br />Provide compaction of preleveling HMA to the satisfaction of the Engineer and may <br />require the use of small steel wheel rollers, plate compactors, or pneumatic rollers to <br />avoid bridging across preleveled areas by the compaction equipment. Provide Engineer <br />approved compaction equipment used for the compaction of preleveling HMA. <br />Clean the entire surface of the pavement before construction of HMA on an existing <br />paved surface. Entirely remove all fatty asphalt patches, grease drippings, and other <br />objectionable matter from the existing pavement. Thoroughly clean all pavements or <br />bituminous surfaces of dust, soil, pavement grindings, and other foreign matter. Fill all <br />holes and small depressions with an appropriate class of HMA. Level and thoroughly <br />compact the patched area surface. Obtain Engineer approval of the surface prior to the <br />application of tack coat or paving. <br />Apply an asphalt tack coat to all paved surfaces that HMA is to be placed or abutted; <br />except, that tack coat may be omitted from clean, newly paved surfaces at the <br />Engineer’s discretion. Uniformly apply tack coat to cover the existing pavement with a <br />thin film of residual asphalt free of streaks and bare spots at a rate between 0.02 and <br />0.10 gallons per square yard of retained asphalt. Obtain application rate approval from <br />Engineer. Apply a heavy application of tack coat to all joints. For Roadways open to <br />traffic, limit the application of tack coat to surfaces that will be paved during the same
The URL can be used to link to this page
Your browser does not support the video tag.