My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Interwest Construction Inc. 12/17/2025
>
Contracts
>
Capital Contract
>
Capital Construction Contracts and Change Orders
>
Interwest Construction Inc. 12/17/2025
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/17/2025 10:39:10 AM
Creation date
12/17/2025 10:24:02 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Interwest Construction Inc.
Approval Date
12/17/2025
Council Approval Date
12/10/2025
Department
Public Works
Department Project Manager
Amie Campbell
Subject / Project Title
Water Main Y, Phase 2
Tracking Number
0005048
Total Compensation
$2,020,202.02
Contract Type
Capital Contract
Contract Subtype
Capital Construction Contracts and Change Orders
Retention Period
10 Years Then Transfer to State Archivist
Imported from EPIC
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
591
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
CITY OF EVERETT SPECIAL PROVISIONS <br /> <br />Water Main Replacement “Y” – Ph 2 Div 5 – SURF TREATMTS & PVMTS October 2025 <br />Work Order No. UP 3814 SP-171 <br />Category 2: Sensitive information <br />Category 2: For official use only / disclosure permissible by law. <br />5-04.3(10)C HMA Compaction – Cyclic Density <br />Low cyclic density areas are defined as spots or streaks in the pavement that are <br />less than 90 percent of the theoretical maximum density. At the Engineer’s <br />discretion, the Engineer may evaluate the HMA pavement for low cyclic density and <br />when doing so will follow WSDOT SOP 733. A $500 Cyclic Density Price Adjustment <br />will be assessed for any 500-foot section with two or more density readings below <br />90 percent of the theoretical maximum density. <br />5-04.3(10)D Vacant <br />5-04.3(10)E HMA Nonstatistical Compaction <br />5-04.3(10)E1 HMA Nonstatistical Compaction – Lots and Sublots <br />City will perform acceptance testing on HMA compaction that is accepted by <br />nonstatistical evaluation by dividing the project into compaction lots. <br />A lot is represented by randomly selected samples of the same mix design that <br />will be tested for acceptance. A lot is defined as the total quantity of material or <br />work produced for each Job Mix Formula placed. Only one lot per JMF is <br />expected. A sublot is equal to one day’s production or 400 tons, whichever is <br />less, except; the final sublot will be a minimum of 200 tons and may be <br />increased to 800 tons. Testing for compaction will be at the rate of 5 tests per <br />sublot per WSDOT T 738. <br />Engineer will determine the sublot locations within each density lot. For a lot in <br />progress with a CPF less than 0.75, Contractor may request a new lot begin <br />after the Engineer is satisfied that material conforming to the Specifications can <br />be produced. <br />Compact HMA mixture accepted by commercial evaluation and HMA <br />constructed under conditions other than those listed above on the basis of a <br />test point evaluation of the compaction train. Perform the test point evaluation <br />in accordance with instructions from the Engineer. Use the number of passes <br />with an approved compaction train required to attain the maximum test point <br />density on all subsequent paving. <br />Thoroughly compact HMA for preleveling. Compact HMA used to prelevel <br />wheel ruts with a pneumatic tire roller unless Engineer approves. <br />5-04.3(10)E2 HMA Compaction Nonstatistical Evaluation – <br />Acceptance Testing <br />Engineer will randomly select the location of the HMA compaction acceptance <br />tests from within each sublot, with one test per sublot. <br />5-04.3(10)E3 HMA Nonstatistical Compaction – Price Adjustments <br />For each compaction lot with one or two sublots where all sublots attain a <br />relative density that is 92 percent of the reference maximum density the HMA, <br />City will accept at the unit Contract price with no further evaluation. If a sublot <br />does not attain a relative density that is 92 percent of the reference maximum <br />density, the City will evaluate the lot in accordance with Section 1-06.2 to <br />determine the appropriate CPF, with the maximum CPF being 1.00. However, <br />lots with a calculated CPF in excess of 1.00 will be used to offset lots with CPF <br />values below 1.00 but greater than 0.90. Lots with CPF lower than 0.90 will be <br />evaluated for compliance per 5-04.3(11). Additional testing by either a nuclear <br />moisture-density gauge or cores will be completed as required to provide a <br />minimum of three tests for evaluation. <br />For compaction below the required 92% a Non-Conforming Compaction Factor <br />(NCCF) will be determined. The NCCF equals the algebraic difference of CPF
The URL can be used to link to this page
Your browser does not support the video tag.