My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Interwest Construction Inc. 12/17/2025
>
Contracts
>
Capital Contract
>
Capital Construction Contracts and Change Orders
>
Interwest Construction Inc. 12/17/2025
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/17/2025 10:39:10 AM
Creation date
12/17/2025 10:24:02 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Interwest Construction Inc.
Approval Date
12/17/2025
Council Approval Date
12/10/2025
Department
Public Works
Department Project Manager
Amie Campbell
Subject / Project Title
Water Main Y, Phase 2
Tracking Number
0005048
Total Compensation
$2,020,202.02
Contract Type
Capital Contract
Contract Subtype
Capital Construction Contracts and Change Orders
Retention Period
10 Years Then Transfer to State Archivist
Imported from EPIC
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
591
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
CITY OF EVERETT SPECIAL PROVISIONS <br /> <br />Water Main Replacement “Y” – Ph 2 Div 5 – SURF TREATMTS & PVMTS October 2025 <br />Work Order No. UP 3814 SP-172 <br />Category 2: Sensitive information <br />Category 2: For official use only / disclosure permissible by law. <br />minus 1.00 multiplied by 40 percent. The Compaction Price Adjustment will be <br />calculated as the product of CPF, the quantity of HMA in the compaction control <br />lot in tons, and the unit Contract price per ton of mix. <br />5-04.3(11) Reject Work <br />5-04.3(11)A Reject Work General <br />City will reject defective or non-conforming Work. The Contractor may propose, in <br />writing, alternatives to removal and replacement of rejected material. Engineer has <br />sole discretion to determine acceptability of such alternative proposals. Submit <br />corrective action proposal for Engineer approval for rejected HMA not conforming <br />to the requirements in Section 1-06.2(2) and this specification. <br />5-04.3(11)B Rejection by Contractor <br />The Contractor may, prior to sampling, elect to remove any defective material and <br />replace it with new material. Any such new material will be sampled, tested, and <br />evaluated for acceptance. <br />5-04.3(11)C Rejection Without Testing (Mixture or Compaction) <br />The Engineer may, without sampling, reject any batch, load, or section of Roadway <br />that appears defective. Do NOT incorporate material rejected before placement into <br />the pavement. Remove any rejected section of Roadway. <br />No payment will be made for the rejected materials or the removal of the materials <br />unless the Contractor requests testing of the rejected material. If the Contractor <br />elects to have the rejected material tested, obtain and test a minimum of three <br />representative samples. Acceptance of rejected material will be based on <br />conformance with the nonstatistical acceptance Specification. If the CPF for the <br />rejected material is less than 0.75, no payment will be made for the rejected material <br />and Contractor will bear the cost of sampling and testing. If the CPF is greater than <br />or equal to 0.75, the City will bear the cost of sampling and testing. If the material is <br />rejected before placement and the CPF is greater than or equal to 0.75, <br />compensation for the rejected material will be at a CPF of 0.75. If rejection occurs <br />after placement and the CPF is greater than or equal to 0.75, compensation for the <br />rejected material will be at the calculated CPF with an addition of 25 percent of the <br />unit Contract price added for the cost of removal and disposal. <br />5-04.3(11)D Rejection – A Partial Sublot <br />In addition to the random acceptance sampling and testing, the Engineer may also <br />isolate from a normal sublot any material that is suspected of being defective in <br />relative density, gradation, or asphalt binder content. Such isolated material will not <br />include an original sample location. Engineer will obtain a minimum of three random <br />samples of the suspect material to test. The material will then be statistically <br />evaluated as an independent lot in accordance with Section 1-06.2(2). <br />5-04.3(11)E Rejection – An Entire Sublot <br />Engineer may reject an entire sublot suspected of being defective. When a sublot <br />is rejected, obtain a minimum of two additional random samples from this sublot. <br />Evaluate these additional samples and the original sublot as an independent lot in <br />accordance with Section 1-06.2(2). <br />5-04.3(11)F Rejection – A Lot in Progress <br />Shut down operations and do NOT resume HMA placement until such time as the <br />Engineer is satisfied that material conforming to the Specifications can be produced: <br />a. When the Composite Pay Factor (CPF) of a lot in progress drops below <br />1.00 and the Contractor is taking no corrective action, or
The URL can be used to link to this page
Your browser does not support the video tag.