My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Interwest Construction Inc. 12/17/2025
>
Contracts
>
Capital Contract
>
Capital Construction Contracts and Change Orders
>
Interwest Construction Inc. 12/17/2025
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/17/2025 10:39:10 AM
Creation date
12/17/2025 10:24:02 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Interwest Construction Inc.
Approval Date
12/17/2025
Council Approval Date
12/10/2025
Department
Public Works
Department Project Manager
Amie Campbell
Subject / Project Title
Water Main Y, Phase 2
Tracking Number
0005048
Total Compensation
$2,020,202.02
Contract Type
Capital Contract
Contract Subtype
Capital Construction Contracts and Change Orders
Retention Period
10 Years Then Transfer to State Archivist
Imported from EPIC
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
591
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
CITY OF EVERETT SPECIAL PROVISIONS <br /> <br />Water Main Replacement “Y” – Ph 2 Div 5 – SURF TREATMTS & PVMTS October 2025 <br />Work Order No. UP 3814 SP-174 <br />Category 2: Sensitive information <br />Category 2: For official use only / disclosure permissible by law. <br />in accordance with Section 5-05.3(8)B and the manufacturer’s application <br />procedure. <br />5-04.3(12)B2 Paved Panel Joint Seal <br />Construct the paved panel joint seal in accordance with the requirements <br />specified in section 5-04.3(12)B1 and the following requirement: <br />a. Clean and seal the existing joint between concrete panels in <br />accordance with Section 5-01.3(8) and the details shown in the <br />Standard Plans. <br />5-04.3(13) Surface Smoothness <br />Provide the completed surface of all courses having uniform texture, smooth, uniform as <br />to crown and grade, and free from defects of all kinds. Provide wearing course <br />completed surface that does NOT vary more than 1/8 inch from the lower edge of a 10- <br />foot straightedge placed on the surface parallel to the centerline. Provide the transverse <br />slope of the wearing course completed surface that does NOT vary more than 1/4 inch <br />in 10 feet from the rate of transverse slope shown in the Plans. <br />When deviations in excess of the above tolerances are found that result from a high <br />place in the HMA, correct the pavement surface using one of the following methods: <br />a. Removal of material from high places by grinding with an approved grinding <br />machine, or <br />b. Removal and replacement of the wearing course of HMA, or <br />c. By other method approved by the Engineer. <br />Carry out defect correction until there are no deviations anywhere greater than the <br />allowable tolerances. <br />City will accept with a price adjustment deviations in excess of the above tolerances that <br />result from a low place in the HMA and deviations resulting from a high place where <br />corrective action, in the opinion of the Engineer, will not produce satisfactory results. The <br />Engineer will deduct from monies due or that may become due to the Contractor the sum <br />of $500.00 for each and every section of single traffic lane 100 feet in length in which <br />any excessive deviations described above are found. <br />When utility appurtenances such as manhole covers and valve boxes are located in the <br />traveled way, adjust the utility appurtenances to the finished grade prior to paving. If <br />Contractor requests, Engineer may waive this requirement or when the adjustment <br />details provided in the project plan or specifications call for utility appurtenance <br />adjustments after the completion of paving. <br />Include utility appurtenance adjustment discussions in the Pre-Paving planning (5- <br />04.3(14)B3). Submit a written request to waive this requirement to the Engineer prior to <br />the start of paving. <br />5-04.3(14) Planing (Milling) Bituminous Pavement <br />Engineer must approve the planing plan. Hold, with Engineer, a pre-planing meeting <br />prior to the start of any planing. See Section 5-04.3(14)B2 for information on planing <br />submittals. <br />Refer to the Plans for locations of existing surfacing being planed. <br />Where planing an existing pavement is specified in the Contract Documents, remove <br />existing surfacing material and reshape the surface to remove irregularities. The finished <br />product must be a prepared surface acceptable for receiving an HMA overlay.
The URL can be used to link to this page
Your browser does not support the video tag.