My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Interwest Construction Inc. 12/17/2025
>
Contracts
>
Capital Contract
>
Capital Construction Contracts and Change Orders
>
Interwest Construction Inc. 12/17/2025
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/17/2025 10:39:10 AM
Creation date
12/17/2025 10:24:02 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Interwest Construction Inc.
Approval Date
12/17/2025
Council Approval Date
12/10/2025
Department
Public Works
Department Project Manager
Amie Campbell
Subject / Project Title
Water Main Y, Phase 2
Tracking Number
0005048
Total Compensation
$2,020,202.02
Contract Type
Capital Contract
Contract Subtype
Capital Construction Contracts and Change Orders
Retention Period
10 Years Then Transfer to State Archivist
Imported from EPIC
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
591
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
CITY OF EVERETT SPECIAL PROVISIONS <br /> <br />Water Main Replacement “Y” – Ph 2 Div 5 – SURF TREATMTS & PVMTS October 2025 <br />Work Order No. UP 3814 SP-173 <br />Category 2: Sensitive information <br />Category 2: For official use only / disclosure permissible by law. <br />b. When the Pay Factor (PF) for any constituent of a lot in progress drops <br />below 0.95 and the Contractor is taking no corrective action, or <br />c. When either the PFi for any constituent or the CPF of a lot in progress is <br />less than 0.75. <br />5-04.3(11)G Rejection – An Entire Lot (Mixture or Compaction) <br />Engineer will reject an entire lot with a CPF of less than 0.75. <br />5-04.3(12) Joints <br />5-04.3(12)A HMA Joints <br />5-04.3(12)A1 Transverse Joints <br />Conduct operations such that the placing of the top or wearing course is a <br />continuous operation or as close to continuous as possible. Unscheduled <br />transverse joints will be allowed and the roller may pass over the unprotected <br />end of the freshly laid mixture only when the placement of the course must be <br />discontinued for such a length of time that the mixture will cool below <br />compaction temperature. When resuming the Work, cut back the previously <br />compacted mixture to produce a slightly beveled edge for the full thickness of <br />the course. <br />Construct a 20H:1V temporary wedge of HMA where a transverse joint, as a <br />result of paving or planing, is open to traffic. Separate the HMA in the temporary <br />wedge from the permanent HMA by strips of heavy wrapping paper or other <br />methods Engineer approves. Remove the wrapping paper and the joint. Trim <br />to a slightly beveled edge for the full thickness of the course prior to resumption <br />of paving. <br />Remove and dispose of the cut away material and place new mix against the <br />cut. Use rollers or tamping irons to seal the joint. <br />5-04.3(12)A2 Longitudinal Joints <br />Offset the longitudinal joint in any one course from the course immediately <br />below by not more than 6 inches nor less than 2 inches. Locate all wearing <br />course longitudinal joints at a lane line or an edge line of the Traveled Way. <br />Construct a notched wedge joint along all longitudinal joints in the wearing <br />surface of new HMA unless Engineer directs otherwise. Provide a notched <br />wedge joint having a vertical edge of not less than the maximum aggregate <br />size or more than 1/2 of the compacted lift thickness and then taper down on a <br />slope not steeper than 4H:1V. Uniformly compact the sloped portion of the HMA <br />notched wedge joint. <br />5-04.3(12)B Bridge Paving Joint Seals <br />5-04.3(12)B1 HMA Sawcut and Seal <br />Prior to placing HMA on the bridge deck, establish sawcut alignment points at <br />both ends of the bridge paving joint seals to be placed at the bridge ends, and <br />at interior joints within the bridge deck when and where shown in the Plans. <br />Establish the sawcut alignment points in a manner that they remain functional <br />for use in aligning the sawcut after placing the overlay. <br />Submit a Type 1 Working Drawing consisting of the sealant manufacturer’s <br />application procedure. <br />Construct the bridge paving joint seal as specified in the Plans and in <br />accordance with the detail shown in the Standard Plans. Construct the sawcut <br />in accordance with the detail shown in the Standard Plan. Construct the sawcut