My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Interwest Construction Inc. 12/17/2025
>
Contracts
>
Capital Contract
>
Capital Construction Contracts and Change Orders
>
Interwest Construction Inc. 12/17/2025
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/17/2025 10:39:10 AM
Creation date
12/17/2025 10:24:02 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Interwest Construction Inc.
Approval Date
12/17/2025
Council Approval Date
12/10/2025
Department
Public Works
Department Project Manager
Amie Campbell
Subject / Project Title
Water Main Y, Phase 2
Tracking Number
0005048
Total Compensation
$2,020,202.02
Contract Type
Capital Contract
Contract Subtype
Capital Construction Contracts and Change Orders
Retention Period
10 Years Then Transfer to State Archivist
Imported from EPIC
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
591
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
CITY OF EVERETT SPECIAL PROVISIONS <br /> <br />Water Main Replacement “Y” – Ph 2 Div 1 – GEN REQUIREMENTS October 2025 <br />Work Order No. UP 3814 SP-44 <br />Category 2: Sensitive information <br />Category 2: For official use only / disclosure permissible by law. <br />Sum, additional compensation that the Contractor attempts to pass through or assert <br />against the City, or claims against the City arising out of a third party’s claim against the <br />Contractor. Certified Claim means the same as Contract Claim. <br />Contract Documents: All of the items that together make up the complete Contract. <br />See definition for “Contract.” <br />Contract Execution Date: The date the Mayor of the City of Everett signs the Contract <br />or the date that the Contractor signs the Contract, whichever date is later. This officially <br />binds the Contractor to the Contract. <br />Contract Sum: The price in dollars stated in the Contract to be paid by the City to the <br />Contractor for the Work described in the Contract Documents, as modified by Change <br />Orders. <br />Contract Time: The period of time established by the terms and conditions of the <br />Contract within which the Work must be physically completed. <br />Delay: Any increase in the duration of the critical path of the Project. <br />Dispute: Any controversy or disagreement. <br />Equipment: Mechanical, electrical, instrumentation, or other devices with one or more <br />moving parts, or devices requiring an electrical, pneumatic, electronic, or hydraulic <br />connection. <br />Extended Overhead: The increase in Overhead costs attributable to an extension of <br />Contract Time. <br />Extra Work: Providing materials and Equipment and the performance of Work not <br />directly called for in, or implied by, the Contract Documents, such that Contractor would <br />be entitled to an adjustment of Contract Sum and possibly an extension of Contract <br />Time. <br />Final Acceptance: Formal action by Everett City Council determining that all of the <br />Contractor's Work has been completed, except for any landscaping maintenance. <br />Float: The amount of time between the early start date and the late start date, or the <br />early finish date and the late finish date of an activity in the Project schedule. <br />Force Account: Costs of performing Work as defined in 1-09.6 FORCE ACCOUNT. <br />Furnish: To deliver items, Equipment, or material to the job site or other specified <br />location. <br />Install: Placing, erecting, or constructing complete in place items, Equipment, or <br />material. <br />May: Conduct that is permitted, but not required. <br />Notice: A signed, written communication by the Contractor to the City as described in <br />1-04.5 NOTICE BY CONTRACTOR of these Special Provisions. <br />Notice of Award: The written notice from the City of Everett to the successful Bidder <br />signifying the City’s acceptance of the Bid. No Contract is formed until the Contract <br />Execution Date. <br />Notice to Proceed: The written Notice from the City or City’s Representative to the <br />Contractor authorizing and directing the Contractor to proceed with the Work and <br />establishing the date on which the Contract Time begins. Multiple and partial Notices to <br />Proceed may be issued on a single Project. <br />Over absorbed Overhead: Over recovery of fixed indirect costs that occurs when a <br />Contractor performs more overall Work than it otherwise would have performed.
The URL can be used to link to this page
Your browser does not support the video tag.