My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Interwest Construction Inc. 12/17/2025
>
Contracts
>
Capital Contract
>
Capital Construction Contracts and Change Orders
>
Interwest Construction Inc. 12/17/2025
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/17/2025 10:39:10 AM
Creation date
12/17/2025 10:24:02 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Interwest Construction Inc.
Approval Date
12/17/2025
Council Approval Date
12/10/2025
Department
Public Works
Department Project Manager
Amie Campbell
Subject / Project Title
Water Main Y, Phase 2
Tracking Number
0005048
Total Compensation
$2,020,202.02
Contract Type
Capital Contract
Contract Subtype
Capital Construction Contracts and Change Orders
Retention Period
10 Years Then Transfer to State Archivist
Imported from EPIC
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
591
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
CITY OF EVERETT SPECIAL PROVISIONS <br /> <br />Water Main Replacement “Y” – Ph 2 Div 1 – GEN REQUIREMENTS October 2025 <br />Work Order No. UP 3814 SP-46 <br />Category 2: Sensitive information <br />Category 2: For official use only / disclosure permissible by law. <br />Provide: Furnish and Install, complete in place. <br />Punch List: List of incomplete items of Work and of items of Work that do not conform <br />to the requirements of the Contract Documents. The Punch List is prepared after <br />Substantial Completion. <br />RCW: Means the Revised Code of Washington <br />Schedule of Values: Allocation of Contract Sum to items of Work as described in 1-09.9 <br />PAYMENTS of these Special Provisions. <br />Shall: Required conduct. <br />Shown: Refers to information presented on the Plans, with or without reference to the <br />Plans. <br />Specify: Refers to information described, shown, noted, or presented in any manner in <br />the Contract. <br />Submittals: The information required by the Contract Documents provided by <br />Contractor to the City’s Representative or City. <br />Total Float: The amount of time a given activity or path of activities may be delayed <br />before it will affect the Completion Date. <br />Traffic : Both vehicular and non-vehicular traffic, such as pedestrians, bicyclists, <br />wheelchairs, and equestrian traffic. <br />Unabsorbed Overhead: The reduction or loss of contribution to recovery of the <br />Contractor’s Overhead costs realized by the result of reduced Project or Contractor <br />billings, or both, due to any reason whatsoever, including a Project extension. <br />Unit Price Work: Refers to items of Work identified by unit prices in the Proposal. <br /> <br />1-02 BID PROCEDURES AND CONDITIONS <br />1-02.1 Prequalifications of Bidders <br />Delete 1-02.1 and substitute the following: <br />1-02.1 Bidder Responsibility Criteria <br />(******) <br />1-02.1(1) Mandatory Bidder Responsibility Criteria <br />(******) <br />Bidder shall meet mandatory responsibility criteria in accordance with RCW <br />39.04.350(1). The City may require Bidder to submit documentation demonstrating <br />compliance with the criteria under this 1-02.1(1). Bidder must: <br />1. Registration. At the time of bid submittal, have a certificate of registration in <br />compliance with chapter 18.27 RCW, a plumbing contractor license in compliance <br />with chapter 18.106 RCW, an elevator contractor license in compliance with chapter <br />70.87 RCW, or an electrical contractor license in compliance with chapter 19.28 <br />RCW, as required under the provisions of those chapters; and <br />2. UBI. Have a current Washington Unified Business Identifier (UBI) number; and <br />3. State Requirements. If applicable: <br />a. Have Industrial Insurance (workers’ compensation) coverage for the bidder’s <br />employees working in Washington, as required in Title 51 RCW;
The URL can be used to link to this page
Your browser does not support the video tag.