My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Interwest Construction Inc. 12/17/2025
>
Contracts
>
Capital Contract
>
Capital Construction Contracts and Change Orders
>
Interwest Construction Inc. 12/17/2025
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/17/2025 10:39:10 AM
Creation date
12/17/2025 10:24:02 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Interwest Construction Inc.
Approval Date
12/17/2025
Council Approval Date
12/10/2025
Department
Public Works
Department Project Manager
Amie Campbell
Subject / Project Title
Water Main Y, Phase 2
Tracking Number
0005048
Total Compensation
$2,020,202.02
Contract Type
Capital Contract
Contract Subtype
Capital Construction Contracts and Change Orders
Retention Period
10 Years Then Transfer to State Archivist
Imported from EPIC
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
591
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
CITY OF EVERETT SPECIAL PROVISIONS <br /> <br />Water Main Replacement “Y” – Ph 2 Div 1 – GEN REQUIREMENTS October 2025 <br />Work Order No. UP 3814 SP-55 <br />Category 2: Sensitive information <br />Category 2: For official use only / disclosure permissible by law. <br />• Submit to the City two original paper payment bonds and two original paper <br />performance bonds submitted on forms contained in Contract Documents and <br />fully executed, with proper power of attorney document(s). <br />• Submit to the City in pdf format certificate of Insurance and additional insured <br />endorsements in accordance with the Contract Documents. <br /> <br />After receipt of the information, bonds and insurance documents described above, the <br />Contract will be entered into the City’s AdobeSign system for execution. Contractor must <br />execute the Contract within three business days after receipt from the City’s AdobeSign <br />System. <br />Until the City executes the Contract, no Bid shall bind the City nor shall any Work begin <br />within the project limits or within City-furnished sites. The Bidder shall bear all risks for any <br />Work begun outside such areas and for any materials ordered before the Contract is <br />executed by the City. <br />If the Bidder experiences circumstances beyond its control that prevents delivery of the <br />bonds and insurance documents within 14-calendar days after receipt of the Notice of <br />Award or execution of the Contract within three business days after receipt from <br />AdobeSign, the City may grant more time, provided the City deems the circumstances <br />warrant it. <br />A Contract shall not be formed until the Contract is signed by the Mayor. <br />1-03.4 Contract Bond <br />Revise 1-03.4 to read as follows: <br />The Contractor shall provide a separate payment bond and performance bond, each in <br />the amount of 100 percent of the Contract Sum and each in the form contained in the <br />Contract Documents. These bonds shall serve as security for the faithful performance <br />of the Work and as security for the faithful payment and satisfaction of the persons <br />furnishing materials and performing labor on the Work. The bonds shall be issued by a <br />corporation duly and legally licensed to transact surety business in the State of <br />Washington. Such bonds shall remain in force throughout the period required to <br />complete the Work, and thereafter for a period of 365 calendar days after Final <br />Acceptance. The bonds must be executed by a duly licensed surety company, which is <br />listed in the latest Circular 570 of the United States Treasury Department, as being <br />acceptable as surety on federal bonds. No surety's liability on the bond shall exceed the <br />underwriting limitations for the respective surety specified in Circular 570. The bonds <br />must be signed by an officer of the Contractor empowered to sign binding instruments. <br />The bonds must be accompanied by a fully executed and original power of attorney for <br />the officer executing on behalf of the surety. The scope of the bonds or the form thereof <br />prescribed in these Contract Documents shall in no way affect or alter the liabilities of <br />the Contractor to the City as set forth in the Contract Documents. <br />1-03.5 Failure to Execute Contract <br />Supplement 1-03.5 by adding the following: <br />In addition to the items listed in the first paragraph of 1-03.5, failure to have or obtain a <br />City of Everett business license prior to executing the Contract, unless immediately <br />cured by Bidder after notice from the City, shall result in forfeiture of the proposal bond <br />or deposit of this Bidder.
The URL can be used to link to this page
Your browser does not support the video tag.