My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Interwest Construction Inc. 12/17/2025
>
Contracts
>
Capital Contract
>
Capital Construction Contracts and Change Orders
>
Interwest Construction Inc. 12/17/2025
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/17/2025 10:39:10 AM
Creation date
12/17/2025 10:24:02 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Interwest Construction Inc.
Approval Date
12/17/2025
Council Approval Date
12/10/2025
Department
Public Works
Department Project Manager
Amie Campbell
Subject / Project Title
Water Main Y, Phase 2
Tracking Number
0005048
Total Compensation
$2,020,202.02
Contract Type
Capital Contract
Contract Subtype
Capital Construction Contracts and Change Orders
Retention Period
10 Years Then Transfer to State Archivist
Imported from EPIC
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
591
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
CITY OF EVERETT SPECIAL PROVISIONS <br /> <br />Water Main Replacement “Y” – Ph 2 Div 1 – GEN REQUIREMENTS October 2025 <br />Work Order No. UP 3814 SP-56 <br />Category 2: Sensitive information <br />Category 2: For official use only / disclosure permissible by law. <br />1-03.6 Return of Bid Deposit <br />Supplement 1-03.6 by adding the following: <br />Within 15 calendar days after the Bids are opened, the City will return the bid deposit <br />accompanying the Bids that are not to be considered in making the Award. <br />1-03.7 Judicial Review <br />Revise 1-03.7 to read as follows: <br />All protests by Bidders must be in accordance with Chapter 3.46 of the Everett Municipal <br />Code, “Bid Protest Procedures.” <br />The exclusive venue of all lawsuits shall be in Snohomish County Superior Court. <br /> <br />1-04 SCOPE OF THE WORK <br />1-04.1 Intent of the Contract <br />Supplement 1-04.1 by adding the following: <br />1-04.1(3) Specifications and Plans <br />(******) <br />1-04.1(3)A Interpretation of Specifications and Plans <br />The Specifications and Plans are intended to be explanatory and supportive of each <br />other. Work specified on the Plans and not in the Specifications, or vice versa, shall <br />be executed as if specified in both. In the event the Work to be done or matters <br />relative thereto are not sufficiently detailed or explained in the Contract Documents, <br />the Contractor shall immediately ask the City’s Representative for further <br />explanation and shall comply with such explanation. In the event of doubt or <br />question arising respecting the true meaning of the Specifications or Plans, <br />Contractor shall refer to the City’s Representative for its decision. <br />1-04.1(3)B Division of Specifications and Plans <br />Specifications and Plans are divided into groups for convenience. These divisions <br />are not for the purpose of apportioning Work or responsibility for Work among <br />Subcontractors, Suppliers, and manufacturers. The Contractor is responsible for all <br />Work shown or described, regardless of location(s) in the Contract Documents. <br />1-04.1(3)C Discrepancies in Specifications and Plans <br />1-04.1(3)C(1) Errors and Omissions <br />If the Contractor becomes aware of any errors or omissions in the Contract <br />Documents or in the City's field work, it shall immediately inform the City’s <br />Representative in writing. The City’s Representative will promptly review the <br />matter and if it finds an error or omission has been made; it will determine the <br />corrective actions and advise the Contractor accordingly. If the corrective work <br />associated with an error or omission increases or decreases the amount of <br />Work called for in the Contract, the City will issue an appropriate Change Order. <br />After discovery by the Contractor of an error or omission, related Work <br />performed by the Contractor shall be done at its risk unless authorized by the <br />City’s Representative and approved by the City. <br />1-04.1(3)C(2) Conflicting Provisions <br />In the event an item of Work is described differently in two or more locations on <br />the Plans, in the Specifications and Special Provisions, the Contractor shall, <br />upon request of the City’s Representative, submit in writing to the City’s
The URL can be used to link to this page
Your browser does not support the video tag.