My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Interwest Construction Inc. 12/17/2025
>
Contracts
>
Capital Contract
>
Capital Construction Contracts and Change Orders
>
Interwest Construction Inc. 12/17/2025
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/17/2025 10:39:10 AM
Creation date
12/17/2025 10:24:02 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Interwest Construction Inc.
Approval Date
12/17/2025
Council Approval Date
12/10/2025
Department
Public Works
Department Project Manager
Amie Campbell
Subject / Project Title
Water Main Y, Phase 2
Tracking Number
0005048
Total Compensation
$2,020,202.02
Contract Type
Capital Contract
Contract Subtype
Capital Construction Contracts and Change Orders
Retention Period
10 Years Then Transfer to State Archivist
Imported from EPIC
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
591
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
CITY OF EVERETT SPECIAL PROVISIONS <br /> <br />Water Main Replacement “Y” – Ph 2 Div 1 – GEN REQUIREMENTS October 2025 <br />Work Order No. UP 3814 SP-59 <br />Category 2: Sensitive information <br />Category 2: For official use only / disclosure permissible by law. <br />If the Contractor and City agree on the scope of Work and any changes to Contract Sum <br />and Contract Time, the Contractor and City shall execute an agreed Change Order. <br />However, if the Contractor and City do not agree, the City may, in its sole discretion, <br />issue a unilateral Change Order in the form attached to the Contract Documents <br />changing the scope of Work and making any adjustments to the Contract Sum pursuant <br />to 1-09.4 EQUITABLE ADJUSTMENT and Contract Time pursuant to 1-08.8 <br />EXTENSIONS OF TIME in such amount and for such time as the City believes <br />appropriate. Contractor agrees to use the agreed Change Order form attached to the <br />Contract Documents. The Contractor accepts all requirements, terms and conditions of <br />a Change Order by: signing it; writing a separate acceptance; or by failing to notify the <br />City immediately in writing that Contractor disagrees with the Change Order and does <br />not intend to be bound by its terms. <br />The Contractor waives and is estopped from denying its agreement with any unilateral <br />Change Order for which the Contractor does not immediately give Notice to the City as <br />provided in 1-04.5 NOTICE BY CONTRACTOR in these Special Provisions and <br />submitting a Contract Claim as provided in 1-09.11(2) CONTRACT CLAIMS in these <br />Special Provisions. A unilateral Change Order that is not timely protested as provided in <br />this section shall be full payment and final settlement of all asserted and unasserted <br />Contract Claims for Contract Time and all costs of any kind, including costs of Delays, <br />inefficiencies and impacts, related to, arising out of, or resulting from, any Work <br />described in the Change Order. <br />The Contractor shall obtain written consent of the Surety or Sureties if the City’s <br />Representative requests such consent. <br />1-04.4(4) Value Engineering and Cost Sharing <br />(******) <br />The Contractor may submit proposals for changing the Plans, Specifications, or other <br />requirements of the Contract Documents and the City, in its sole discretion, may accept <br />or reject such proposals. If accepted by the City and if the proposal decreases the direct, <br />actual costs of constructing the Work, the Contract Sum shall be reduced by fifty percent <br />(50%) of the direct, actual construction cost saved. Because the City has the sole <br />discretion whether to consider, accept or reject the Contractor’s proposal and the <br />Contractor has no right to require the City to consider or accept such proposals, the <br />City’s decision is not reviewable by any court. This subsection applies only to change <br />proposals initiated solely by the Contractor, or its Subcontractors and suppliers, and <br />does not apply to change proposals requested or initiated by the City or the City’s <br />Representative. The City is not obligated or required to consider any Contractor initiated <br />change proposals and may, in its sole discretion, refuse to do so. Under no <br />circumstances shall the Contractor be entitled to additional compensation arising out of, <br />or related to, the City’s refusal to consider or approve a Contractor initiated change <br />proposal. The Contractor shall do none of the following without the express written <br />agreement of the City: fail to perform any Work; commence Work on proposed change; <br />reduce its resources assigned to performance of the Work in order to prepare a change <br />proposal or in anticipation of approval of a change proposal; adjust or change the project <br />schedule or take action or fail to take action that would affect the Completion Date of the <br />Work; take action or fail to take action arising out of the Contractor’s change proposal <br />that would result in the Contractor seeking an adjustment upward of the Contract Sum.
The URL can be used to link to this page
Your browser does not support the video tag.