My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Interwest Construction Inc. 12/17/2025
>
Contracts
>
Capital Contract
>
Capital Construction Contracts and Change Orders
>
Interwest Construction Inc. 12/17/2025
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/17/2025 10:39:10 AM
Creation date
12/17/2025 10:24:02 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Interwest Construction Inc.
Approval Date
12/17/2025
Council Approval Date
12/10/2025
Department
Public Works
Department Project Manager
Amie Campbell
Subject / Project Title
Water Main Y, Phase 2
Tracking Number
0005048
Total Compensation
$2,020,202.02
Contract Type
Capital Contract
Contract Subtype
Capital Construction Contracts and Change Orders
Retention Period
10 Years Then Transfer to State Archivist
Imported from EPIC
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
591
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
CITY OF EVERETT SPECIAL PROVISIONS <br /> <br />Water Main Replacement “Y” – Ph 2 Div 1 – GEN REQUIREMENTS October 2025 <br />Work Order No. UP 3814 SP-58 <br />Category 2: Sensitive information <br />Category 2: For official use only / disclosure permissible by law. <br />Revise the seventh paragraph of 1.04.2 to read as follows: <br />In case of any ambiguity or dispute over interpreting the Contract, the Engineer’s <br />decision will be final as provided in 1-05.1 AUTHORITY OF THE ENGINEER. <br />1-04.3 Reference Information <br />Revise 1-04.3 to read as follows: <br />Reference Information provided to the Contractor is not part of the Contract. The City of <br />Everett does not guarantee the accuracy of the Reference Information and is not <br />responsible for the content of the Reference Information in any manner. Any use of <br />Reference Information by the Contractor is done solely at the Contractor’s risk. <br />1-04.4 Changes <br />Delete 1-04.4 and substitute the following: <br />1-04.4 Changes <br />1-04.4(1) City’s Right to Direct Changes to the Work <br />(******) <br />The City reserves the right to change the Work at any time. Such changes shall not <br />invalidate the Contract nor release the Surety, and the Contractor agrees to perform the <br />Work as changed. Among others, these changes and alterations may include: <br />1. Deleting or omitting any part of the Work, Equipment, or material to be provided <br />under this Contract, <br />2. Increasing or decreasing quantities, <br />3. Altering Specifications, designs, or both, <br />4. Altering the way the Work is to be done, <br />5. Adding new Work or Extra Work, <br />6. Altering facilities, Equipment, materials, services, or sites, provided by the City, <br />and <br />7. Ordering the Contractor to accelerate or Delay the Work. <br />If the Contractor and City do not agree upon scope of Work changed or adjustment to <br />the Contract Sum and Contract Time, the City may, at its sole option, unilaterally direct <br />the Contractor to implement City directed change by notice. The City shall not pay or be <br />responsible or liable for changes implemented by the Contractor without explicit notice <br />from the City to proceed. <br />1-04.4(2) Extra Work <br />(******) <br />At its sole option, the City may (1) perform Extra Work itself, (2) employ others to do it, <br />(3) direct the Contractor to perform the Extra Work at existing unit Bid price, (4) direct <br />the Contractor to perform the Extra Work at a mutually agreed upon price, or (5) direct <br />the Contractor to perform the Extra Work on a Force Account basis. <br />1-04.4(3) Change Orders <br />(******) <br />Changes to the Work may result in an increase or decrease in Contract Sum, as provided <br />in 1-09.4 Equitable Adjustment. Requests for an increase in Contract Time shall be made <br />as provided in 1-08.3 PROGRESS SCHEDULE as applicable. Substantial changes in <br />Contract Time, Contract Sum or Work will often be negotiated and agreed between the <br />Contractor and City before the City directs the Contractor to proceed with the change.
The URL can be used to link to this page
Your browser does not support the video tag.