My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Interwest Construction Inc. 12/17/2025
>
Contracts
>
Capital Contract
>
Capital Construction Contracts and Change Orders
>
Interwest Construction Inc. 12/17/2025
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/17/2025 10:39:10 AM
Creation date
12/17/2025 10:24:02 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Interwest Construction Inc.
Approval Date
12/17/2025
Council Approval Date
12/10/2025
Department
Public Works
Department Project Manager
Amie Campbell
Subject / Project Title
Water Main Y, Phase 2
Tracking Number
0005048
Total Compensation
$2,020,202.02
Contract Type
Capital Contract
Contract Subtype
Capital Construction Contracts and Change Orders
Retention Period
10 Years Then Transfer to State Archivist
Imported from EPIC
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
591
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
CITY OF EVERETT SPECIAL PROVISIONS <br /> <br />Water Main Replacement “Y” – Ph 2 Div 1 – GEN REQUIREMENTS October 2025 <br />Work Order No. UP 3814 SP-61 <br />Category 2: Sensitive information <br />Category 2: For official use only / disclosure permissible by law. <br />1-04.5(2) Form of Notice <br />The Notice shall be in writing and include the following minimum information: <br />1. A complete and accurate description of the event(s) giving rise to the Notice, <br />including dates, times, and locations; <br />2. A preliminary list of persons involved in such event; <br />3. A statement whether the Contractor believes the event may result in a <br />Contract Claim for additional Contract Time or adjustment of the Contract <br />Sum; <br />4. A date by which Contractor shall begin providing Supplemental Information as <br />provided in this section. <br />1-04.5(3) Supplemental Information <br />Contractor shall supplement the written Notice as soon as possible with a written <br />statement providing the following: <br />1. The date of the event, incident, direction, instruction, interpretation or <br />determination; <br />2. The nature and circumstances giving rise to the Notice; <br />3. The contract provisions relating to the event, incident, direction, instruction, <br />interpretation or determination; <br />4. The estimated dollar cost, if any, of the Extra Work, Delay, change or disruption <br />and detailing how the dollar amount estimate was determined; and <br />5. An analysis of the progress schedule showing the impact to the schedule <br />resulting from the change or disruption, if the Contractor is asserting a schedule <br />change or disruption; <br />Throughout any work related to a Notice, the Contractor shall keep complete and <br />accurate records of costs, expenses, and time incurred for which Contractor will or may <br />seek an adjustment. Contractor waives and is estopped from seeking an adjustment of <br />Contract Sum or Contract Time where Contractor fails to keep and maintain cost, <br />timekeeping, and scheduling records segregated and contemporaneously allocated to <br />the subject work for which an adjustment is sought. For example, failure to keep <br />contemporaneous labor and equipment time records specifically and only allocated to <br />each item of claimed Extra Work shall constitute a waiver of any Contract Claim for <br />reimbursement or additional Contract Time for each such item of Extra Work. The <br />Contractor shall permit the City access to these and any other records needed for <br />evaluating requests for additional Contract Time or Contract Sum. <br />1-04.5(4) Contract Claim <br />A Contractor dissatisfied with the City’s response or (non-response) to a Notice provided <br />under Section 1-04.5 completely waives any claims related to such Notice unless the <br />Contractor submits a Contract Claim in accordance with Section 1-09.11. <br />1-04.7 Differing Site Conditions (Changed Conditions) <br />Delete all of 1-04.7 and substitute the following: <br />Upon discovery and before such conditions are disturbed, the Contractor shall promptly <br />provide Notice to the City’s Representative of: <br />Pre-existing subsurface or latent physical conditions at the site differing materially <br />from those indicated in this Contract, or
The URL can be used to link to this page
Your browser does not support the video tag.