My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Interwest Construction Inc. 12/17/2025
>
Contracts
>
Capital Contract
>
Capital Construction Contracts and Change Orders
>
Interwest Construction Inc. 12/17/2025
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/17/2025 10:39:10 AM
Creation date
12/17/2025 10:24:02 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Interwest Construction Inc.
Approval Date
12/17/2025
Council Approval Date
12/10/2025
Department
Public Works
Department Project Manager
Amie Campbell
Subject / Project Title
Water Main Y, Phase 2
Tracking Number
0005048
Total Compensation
$2,020,202.02
Contract Type
Capital Contract
Contract Subtype
Capital Construction Contracts and Change Orders
Retention Period
10 Years Then Transfer to State Archivist
Imported from EPIC
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
591
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
CITY OF EVERETT SPECIAL PROVISIONS <br /> <br />Water Main Replacement “Y” – Ph 2 Div 1 – GEN REQUIREMENTS October 2025 <br />Work Order No. UP 3814 SP-62 <br />Category 2: Sensitive information <br />Category 2: For official use only / disclosure permissible by law. <br />Pre-existing unknown physical conditions at the site, of an unusual nature, differing <br />materially from those ordinarily encountered and generally recognized as inhering <br />in work of the character provided for in this Contract. <br />Upon written request, the City’s Representative shall determine whether the actual <br />conditions encountered by the Contractor conditions are materially different and, if so, <br />are the cause of a material increase or decrease in the Contractor’s cost of performance <br />of the Work, or extend the duration of the critical path of the schedule. Upon such <br />determination, the City's Representative will make an adjustment of Contract Sum or <br />Contract Time, as appropriate. Extensions of Contract Time will be evaluated in <br />accordance with 1-08.3 PROGRESS SCHEDULE. <br />The City's Representative’s determination that differing site conditions do not exist <br />and/or the appropriate adjustment in Contract Sum or Contract Time (if any) shall be <br />final. If there is a decrease in the cost or time required to perform the Work, failure of the <br />Contractor to notify the City’s Representative of the differing site condition shall not affect <br />the City’s right to make an adjustment in the Contract Sum or Contract Time. Additionally, <br />no Contract Claim or adjustment of Contract Sum or Contract Time shall be allowed <br />unless the Contractor has followed the procedures provided for in this Contract, <br />including, but not limited to, furnishing timely Notice of the event and its effect on <br />Contract Time and Contract Sum as required herein. <br />Contractor shall in no event be entitled to a Contract Claim or adjustment of Contract <br />Sum or Contract Time based on an allegation that the pre-existing subsurface or latent <br />physical conditions at the site differ materially from those indicated in this Contract <br />unless Contractor establishes that it reasonably relied on the conditions indicated in this <br />Contract when making its bid, that the actual conditions encountered on the site differed <br />materially from those indicated in this Contract, and that such materially-different <br />conditions were not foreseeable at the time of its bid. <br /> <br />1-05 CONTROL OF WORK <br />1-05.1 Authority of the Engineer <br />Delete 1-05.1 and substitute the following: <br />1-05.1 City <br />(******) <br />The City, and the City’s Representative, shall have the authority to act as the sole judge of <br />the Work and materials with respect to both quantity and quality as set forth in the Contract. <br />It is expressly stipulated that the Plans, Specifications, and other Contract Documents set <br />forth the requirements as to the nature of the completed Work and do not purport to control <br />the method of performing Work except in those instances where the nature of the completed <br />Work is dependent on the method of performance. <br />The City has the authority to act, do, perform, and make all decisions and actions authorized <br />by the Contract Documents, including, but not limited to, Change Orders, progress payments, <br />contract decisions, acceptability of the Contractor's Work, and early possession. The City has <br />the authority to accept or reject requests for progress payments that have been submitted by <br />the Contractor and recommended by the City’s Representative. The City has the authority to <br />make determinations of the acceptability of the Work. The City also has the authority to <br />accept or reject the City’s Representative's recommendations regarding retention of defective <br />Work.
The URL can be used to link to this page
Your browser does not support the video tag.