Laserfiche WebLink
CITY OF EVERETT SPECIAL PROVISIONS <br /> <br />Water Main Replacement “Y” – Ph 2 Div 1 – GEN REQUIREMENTS October 2025 <br />Work Order No. UP 3814 SP-66 <br />Category 2: Sensitive information <br />Category 2: For official use only / disclosure permissible by law. <br />In addition to supplemental drawings furnished by the Engineer, the Contract Documents <br />may also be supplemented by Type 1, Type 2 or 2E, and Type 3 or 3E Working Drawings <br />prepared by the Contractor, material supplier, or manufacturer, when necessary or as <br />required by the Contract Documents to detail and illustrate portions of the Work. All types <br />of Working Drawings shall be reviewed by the Engineer before work pursuant to those <br />Working Drawings is performed. Type 3 and 3E Working Drawings may include, and not <br />be limited to, shop details, erection plans, masonry lay-out diagrams, reinforcing steel <br />and bending diagrams, post tensioning plans, shoring, cribbing, cofferdam, or falsework <br />plans, formwork plans, or hydraulic items. Type 2 and 2E Working Drawings may include, <br />and not be limited to, Catalog cuts or standard plans for commonly used manufactured <br />items. <br />The Contractor shall be fully responsible for the accuracy of dimensions and details on <br />Working Drawings, and for complete conformity with the Contract Documents, even if <br />the Working Drawings have been approved by the Engineer, or if the Contractor and the <br />Engineer agree on dimensions and details. The City does not accept Working Drawings <br />as accurate or adequate, and does not take responsibility for, or warrant that Working <br />Drawings will meet Contract requirements. <br />Engineer's review of Working Drawings shall not relieve Contractor from responsibility <br />for variation from the requirements of the Contract Documents unless Contractor has in <br />writing called the Engineer's attention to each such variation at the time of submission, <br />and the Engineer has given written approval of each such variation by a specific written <br />notation thereof incorporated in or accompanying the returned Working Drawing; nor will <br />review by Engineer relieve Contractor from responsibility for errors or omissions in the <br />Working Drawings or from responsibility for having complied with the provisions of this <br />section. <br />The Bid prices shall include all costs for furnishing Working Drawings and Submittals. <br />The following listed sections of the Standard Specifications and Special Provisions <br />require Working Drawings that may or may not be applicable to this specific project. This <br />list is supplied as an aid to the Contractor and is by no means complete. Submittal <br />requirements may be found in 1-05.3(1) or elsewhere in these Special Provisions. <br />DIVISION 1 GENERAL REQUIREMENTS <br /> 1-07.1(2) Health and Safety – Safety and fall protection work plan <br />DIVISION 2 EARTHWORK <br />2-09.3(3)D Shoring, Cribbing, and Cofferdams-Shop Drawings <br />DIVISION 6 STRUCTURES <br />6-01 General Requirements <br />6-01.9 Working Drawings <br />6-03 Steel Structures <br />6-03.3(7) Shop Plans <br />6-03.3(25) Welding and Repair Welding-Shop Drawings