My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Interwest Construction Inc. 12/17/2025
>
Contracts
>
Capital Contract
>
Capital Construction Contracts and Change Orders
>
Interwest Construction Inc. 12/17/2025
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/17/2025 10:39:10 AM
Creation date
12/17/2025 10:24:02 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Interwest Construction Inc.
Approval Date
12/17/2025
Council Approval Date
12/10/2025
Department
Public Works
Department Project Manager
Amie Campbell
Subject / Project Title
Water Main Y, Phase 2
Tracking Number
0005048
Total Compensation
$2,020,202.02
Contract Type
Capital Contract
Contract Subtype
Capital Construction Contracts and Change Orders
Retention Period
10 Years Then Transfer to State Archivist
Imported from EPIC
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
591
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
CITY OF EVERETT SPECIAL PROVISIONS <br /> <br />Water Main Replacement “Y” – Ph 2 Div 1 – GEN REQUIREMENTS October 2025 <br />Work Order No. UP 3814 SP-68 <br />Category 2: Sensitive information <br />Category 2: For official use only / disclosure permissible by law. <br />Any staking requirements for the Project that do not fit field conditions will be reviewed <br />and if necessary adjusted by the Engineer. Any necessary revisions to the staking <br />information will be provided to the Contractor for use in completing the Work. <br />Stakes, marks, and other reference points, including existing monumentation, set by the <br />City shall be carefully preserved by the Contractor. The Contractor will be charged for <br />the costs of replacing stakes, markers and monumentation that were not to be disturbed <br />but were destroyed or damaged by the Contractor's operations. This charge will be <br />deducted from monies due or to become due to the Contractor. <br />To facilitate the establishment of these lines and elevations, the City will provide the <br />Contractor with the following survey control: <br />ROADWAY, SURFACING AND PAVING <br />Establish elevation benchmarks and center or base line alignment control <br />points for the mainline, one time only. Provide right of way stakes where <br />applicable. <br />Provide rights-of-way, easements, or right-of-entry. <br />Provide the Contractor with technical advice if requested. <br />Computed grades where needed. <br />Provide horizontal and vertical curve data. <br />One copy of transit notes showing reference to horizontal and vertical control <br />points. <br />OTHER STRUCTURES <br />Centerline or offset coordinates to centerline of the structure. <br />A sufficient number of benchmarks for levels to enable the Contractor to set <br />grades at reasonably short distances. <br />Monuments and control points as shown on the Plans. <br />The Contractor shall give the City three weeks notification to allow adequate <br />time to provide the above data. <br />The Contractor shall ensure a surveying accuracy within the following tolerances: <br />1. Slope stakes ±0.1 foot <br />2. Subgrade blue tops ±0.01 foot <br />3. Stationing ±0.01 foot <br />4. Alignment ±0.01 foot <br />5. Surfacing red & yellow tops ±0.01 foot <br />6. Superstructure elevations ±0.01 foot (from plan elevations) <br />7. Substructure ±0.02 foot (from plan elevations) <br />The Contractor shall slope stake the roadway before any construction may proceed. <br />Slope stakes shall be set at 50' maximum intervals on tangents and 25’ on curves. <br />Subgrade bluetops and surfacing red and yellow tops shall be set at 50' intervals in <br />tangent sections, 25' intervals in curve sections, and 10' intervals in intersection radii. <br />The Contractor's surveyor shall be a licensed surveyor in the State of Washington. The <br />Contractor shall keep updated survey field notes in a standard field book and in a format <br />set by the Engineer. These field notes shall include all survey work performed by the