My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Interwest Construction Inc. 12/17/2025
>
Contracts
>
Capital Contract
>
Capital Construction Contracts and Change Orders
>
Interwest Construction Inc. 12/17/2025
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/17/2025 10:39:10 AM
Creation date
12/17/2025 10:24:02 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Interwest Construction Inc.
Approval Date
12/17/2025
Council Approval Date
12/10/2025
Department
Public Works
Department Project Manager
Amie Campbell
Subject / Project Title
Water Main Y, Phase 2
Tracking Number
0005048
Total Compensation
$2,020,202.02
Contract Type
Capital Contract
Contract Subtype
Capital Construction Contracts and Change Orders
Retention Period
10 Years Then Transfer to State Archivist
Imported from EPIC
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
591
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
CITY OF EVERETT SPECIAL PROVISIONS <br /> <br />Water Main Replacement “Y” – Ph 2 Div 1 – GEN REQUIREMENTS October 2025 <br />Work Order No. UP 3814 SP-69 <br />Category 2: Sensitive information <br />Category 2: For official use only / disclosure permissible by law. <br />Contractor's surveyor in establishing line, grade, and slopes for the construction work. <br />Copies of these field notes shall be provided to the Engineer upon request and upon <br />completion of the Contract Work; the field book shall be submitted to the Engineer and <br />become property of the City. <br />If the survey work provided by the Contractor does not meet the standards of the <br />Engineer, then the Contractor shall, upon the Engineer's written request, remove the <br />individual or individuals doing the survey work and the survey work will be completed by <br />the Engineer at the Contractor's expense. Costs for completing the survey work required <br />by the Engineer will be deducted from monies due or to become due the Contractor. <br />The City may spot-check the Contractor's surveying. These spot-checks will not change <br />the requirements for normal checking and testing as described elsewhere, and do not <br />relieve the Contractor of the responsibility of producing a finished product that is in <br />accordance with the Contract. <br />In all disputes concerning accuracy of lines and elevations, the City shall be assumed <br />correct and the Contractor shall correct the discrepancies before construction work may <br />proceed. No additional compensation will be paid for this corrective Work. <br />Payment: The lump sum contract price for “Surveying” shall be full pay for all costs <br />involved in furnishing all labor, tools, survey instruments, materials, and other equipment <br />necessary for the setting and maintaining of the alignment and grade as specified. <br />1-05.6 Inspection of Work and Materials <br />Supplement 1-05.6 by adding the following: <br />1-05.6(1) Demonstration of Compliance with Contract Requirements <br />(******) <br />The burden of proving the constructed Work complies with the Contract Documents shall <br />be on the Contractor at all times. The Contractor shall grant the City’s Representative <br />access to the Work and work site and to places where Work is being prepared, or where <br />materials, Equipment, or machinery are being obtained for the Work. The Contractor <br />shall provide information requested by the City’s Representative in connection with <br />inspection work. <br />If the Contract Documents, laws, ordinances, or public regulatory authority requires parts <br />of the Work to be specially inspected, tested, or approved, the Contractor shall give the <br />City’s Representative be not less than two working days prior written Notice of the <br />availability of the subject Work for examination. <br />Inspection and quality control tests performed on the Contractor’s work by the City’s <br />Representative shall not relieve the Contractor of its responsibility for errors or lack of <br />quality therein and shall not be regarded as an assumption of risks or liability by the <br />City’s Representative for the Contractor's compliance with these Contract Documents. <br />Contractor remains responsible and liable for all errors, defects or a lack of quality not <br />discovered by inspection or observation. <br />1-05.6(2) Manufacturer's Directions <br />(******) <br />Manufactured articles, material and Equipment shall be transported, stored, applied, <br />installed, connected, erected, adjusted, tested, operated and maintained as <br />recommended by the manufacturer, unless otherwise specified in these Special <br />Provisions. Contractor shall provide manufacturer's installation instructions and <br />procedures to the City prior to installation of the manufactured articles, material, and <br />Equipment.
The URL can be used to link to this page
Your browser does not support the video tag.