Interwest Construction Inc. 12/17/2025
>
Contracts
>
Capital Contract
>
Capital Construction Contracts and Change Orders
>
Interwest Construction Inc. 12/17/2025
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/17/2025 10:39:10 AM
Creation date
12/17/2025 10:24:02 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Interwest Construction Inc.
Approval Date
12/17/2025
Council Approval Date
12/10/2025
Department
Public Works
Department Project Manager
Amie Campbell
Subject / Project Title
Water Main Y, Phase 2
Tracking Number
0005048
Total Compensation
$2,020,202.02
Contract Type
Capital Contract
Contract Subtype
Capital Construction Contracts and Change Orders
Retention Period
10 Years Then Transfer to State Archivist
Imported from EPIC
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
591
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
CITY OF EVERETT SPECIAL PROVISIONS <br /> <br />Water Main Replacement “Y” – Ph 2 Div 1 – GEN REQUIREMENTS October 2025 <br />Work Order No. UP 3814 SP-71 <br />Category 2: Sensitive information <br />Category 2: For official use only / disclosure permissible by law. <br />1-05.10 Guarantees <br />Supplement 1-05.10 by adding the following: <br />The Contractor further warrants to the City, the Engineer and the City's Representative <br />that all materials and Equipment furnished under this Contract will be of highest quality <br />and new unless otherwise specified by the City, free from faults and defects and in <br />conformance with the Contract Documents. All Work not so conforming to these <br />standards shall be considered defective. If required by the City’s Representative, the <br />Contractor shall furnish satisfactory evidence as to the kind and quality of materials and <br />Equipment. <br />The Work furnished shall be of first quality and the workmanship shall be the best <br />obtainable in the various trades. The Work shall be of safe, substantial, and durable <br />construction in all respects. For a period of 365 calendar days, commencing on the date <br />of Final Acceptance, the Contractor shall, upon the receipt of Notice in writing from the <br />City, promptly make all repairs arising out of defective materials, workmanship, or <br />Equipment at no cost to the City. The City is hereby authorized to make such repairs if, <br />14 calendar days after giving of such notice to the Contractor, the Contractor has failed <br />to make or undertake the repairs with due diligence. In case of an emergency where, in <br />the opinion of the City, delay could cause serious loss or damage, repairs may be made <br />prior to or concurrent with notice being sent to the Contractor. All costs and expenses <br />incurred by the City in connection with repair or replacement of Contractor’s Work under <br />this Section, including but not limited to the cost of materials, Equipment, other <br />contractor costs, additional staff costs (including overtime), inspection, design and <br />construction management service costs shall be fully reimbursed to the City by the <br />Contractor. <br />“Acceptance of the Work” shall not extinguish any covenant or agreement on the part of <br />the Contractor to be performed or fulfilled under this Contract that has not, in fact, been <br />performed or fulfilled at the time of such acceptance. All covenants and agreements shall <br />continue to be binding on the Contractor until they have been fulfilled. <br />The City and the Contractor agree that the guarantee on the completed portions of the <br />Work possessed and used by the City shall commence as to those portions on the date <br />that the City takes possession of those portions and so notifies the Contractor in writing. <br />City and Contractor further agree that such taking possession and use shall not be <br />deemed as acceptance of the Work. Takeover of completed portions of the Work shall <br />be at the City's option and will not be made until the Work can be put into routine service <br />on a permanent basis. <br />The guarantee provided herein shall be in addition to those specific guarantee or <br />warranty requirements for particular Equipment or Work items, or both, as indicated in <br />the Specifications and Special Provisions. <br />1-05.11 Final Inspection <br />Delete 1-05.11 and substitute the following: <br />1-05.11 Final Inspections and Operational Testing <br />(******) <br />1-05.11(1) Substantial Completion Date <br />When the Contractor considers the Work to be substantially complete, the Contractor <br />shall so notify the Engineer and request the Engineer establish the Substantial <br />Completion Date. The Contractor’s request shall list the specific items of Work that <br />remain to be completed in order to reach physical completion. The Engineer will <br />schedule an inspection of the Work with the Contractor to determine the status of
The URL can be used to link to this page
Your browser does not support the video tag.