Laserfiche WebLink
Eintegra <br /> NEUDORFER <br /> ENGINEERS <br /> AN Integra COMPANY <br /> Air Handling Unit <br /> PROJECT: Boeing 40-26 Tower Relocation DATE: 3/3/2025 <br /> LOCATION: Everett,WA CONTACT: Tony Amort <br /> PROJECT#: 2024-0419 AUTHOR: <br /> SYSTEM/UNIT: HVAC-25/Supply Airflow Tested By: Tony Amort <br /> Date: 2/25/2025 <br /> Unit Data Final Data <br /> Type of Traverse Round Sum of Readings 19180 FPM <br /> Instrument Used Pitot Tube Average Reading 959 FPM <br /> Diameter 30 in. Reading Std. Dev. 117.788 FPM <br /> Insulation Width 0 in. Design Total Flow 4500 CFM <br /> Rect.Correction Factor 1 Actual Total Flow 4709 CFM <br /> Air Flow Area 4.91 sq.ft. Static Pressure 0.77 in. <br /> Number Of Rows 2 <br /> Readings Per Row 10 <br /> Total Readings 20 <br /> Traverse Data Points <br /> N <br /> d <br /> 0 <br /> 1763 <br /> 927 <br /> 93d <br /> 855 <br /> 867 <br /> Hole 1 1324 1036 1047 911 1034 ® ® FM-- 823 ® M <br /> 942 <br /> 919 <br /> 951 <br /> 30 <br /> Neudorfer Engineers <br />