Laserfiche WebLink
19 UMC <br /> 130.221313.000 <br /> Project: Boeing 737 North Line Construction <br /> WTC Sump Pump Start Up Reports <br /> UMC Job No. 9059 <br /> 5/14/2025 <br /> Specification: 221313 <br /> Above Ground Sewage Ejector Packaged System <br /> Attached, please find the following UMC submittal for record regarding the Wing Tank <br /> Cleanout (WTC) Sump Pump Start Up Reports for SP-88 A/B and SP-89 A/B. <br /> The following items are included in the submittal package: <br /> • CHC Technicians Service Report <br /> • SIR—88 A/B Start-Up Report <br /> • SIR—89 A/B Start-Up Report <br /> www.umci.com I UNIVMC*343N9 1 1161149 PI W, PO Box 67, Mukilteo, WA 98275 1 (206) 364-9900 <br /> SERVICE (206) 364-9910 <br />