Laserfiche WebLink
LEGEND <br /> 1. SEE SHEET MOc. <br /> IS POINT OF CONNECTION <br /> ® AIR DROP DUPLEX/HARD <br /> 6 AIR DROP SIMPLEX/HARD <br /> 3 3.5 4 14�j 5 O VACUUM OUTLET/HARD <br /> PW PROCESS WATER <br /> FOR PROCESS WATER HOSE GENERAL NOTES <br /> 7/// <br /> CONNECTION DETAIL <br /> SEE 2 TYR l> GLOBE VALVE SHALL BE CRANE 351 OR EQUAL. <br /> 1M126 M589 2� 1/4" QUICK DISCONNET SOCKET, <br /> 3 4" CW & 2" V 3/4"CW 3" V UP 3 4" CW & 2" V TO EWC-1 4' V UP AND DN CEJN 10-310-1455 <br /> 2 <br /> EW 1/2 P AIR LINE FILTER. NORGREN MODEL F17-BOO M3DA. <br /> F -1 TP PROVIDE METAL BOWL WITH SIGHT GLASS AND <br /> MANUAL DRAIN. 1" PORT SIZE. <br /> -�+I AIR LINE REGULATOR. NORGREN MODEL <br /> - � 4„ <br /> 1/2" A PIPE �t a a 1/2"Ar-1/2"A Y CAP 0 4„CW R17-800-RGLA. 1' PORT SIZE. <br /> 9' FROM FLOOR - 3° 1 1/2" a - 40-026-TN-P/4.5-CW-13 EL 16'-6" CL HFF ® BALL VALVE SHALL BE APOLLO 70-100 <br /> > 3 0 OR EQUAL, TYPICAL. <br /> INTERG%" HOSE REEL 2„ > �E 1 2"A DOWN TO AIR PUMP �4" SHALL RATED LIQUID SEPARATOR/VACUUM FILTER <br /> / SHALL BE SOLBERG LRS-275-400F <br /> OVER EXISTING <br /> UNISTRUT VAC FCO < }� FCO 4"SAN DOWN, COf�E�To 0 (E) 6 VACUUM HOSE, KANAFLEX 212-MK <br /> 9' FROM FLOOR CW CW SAN IN TUNNELS 4 SAN o <br /> 3 �NO SERVICE SHALL BE INTERRUPTED OR <br /> 2„ 1 CHANGED WITHOUT WRITTEN PERMISSION FROM <br /> Fn COMPRESSED IR VAC 6 FE-2 N OWNER. <br /> 26 iM1 M55 o 1" ®ALL EXISTING PIPING AND EQUIPMENT <br /> SEE a <br /> 1 2 1/2" CW LOCATIONS SHOWN ARE BASED ON AVAILABLE <br /> M126 M552 4 1"A ��C[Y OR VACUUM � o INFORMATION AND FIELD OBSERVATIONS. <br /> w ONNECTION DETAIL 40-026-TN-R/4.5-CW-12 w CONTRACTORS TO VERIFY LOCATIONS AND FIELD <br /> SEE TYP C' CONDITIONS PRIOR TO START OF NEW WORK. <br /> 5 , <br /> 1M126 M564 2"CW <br /> (E REFERENCE DRAWINGS <br /> 2'� 5/8"A HOSE u 4" <br /> 4'CWR0 110STER r� <br /> 12" R L 4"(E) 0 PUMP SECOND FLOOR 1"CW DN <br /> (oFD) UP— a ���JJJ CONSTRUCTION NOTES <br /> v FIRE RIJIF <br /> SERS <br /> NM00 <br /> 3 u (REF)0 o O <br /> F Dl--- PROVIDE 1/2" AIR CONNECTION AND <br /> POC BALL VALVE AND AIR FILTER AT POINT <br /> 4 1"A UP 2 DN OF CONNECTION. PROVIDE 2" SPENCEF <br /> 1"A UP 1" <br /> "A UP 4" SAN FROM BELOW VACUUM TUBE CONNECTION AT EACH <br /> A UP CAP 6' ABOVE FLOOR <br /> 3 2" CW UP PANEL ROUTER. <br /> AIR MANIFOLD 16"RWL (RD) UP AN DN 3" SAN UP © NEW SPENCER VACUUM SHALL BE <br /> FOR VACUUM CONNECTION DETAIL OWNER FURNISHED AND CONTRACTOR <br /> SPILL 12" QED SEPERATOR DETAIL SEE//���� , TYP INSTALLED. INSTALL PER <br /> 1'-6" ABOVE GRADE SEE 1 TYP � MANUFACTURER'S RECOMMENDATIONS. <br /> 1M126 M589 °q UP 1M126 M552 <br /> COORDINATE ELECTRICAL REQUIREMENTS <br /> PRIOR TO INSTALL. VACUUM PIPE <br /> ROUTING ON THIS PLAN IS <br /> DIAGRAMMATICAL TO SHOW INTENT OF <br /> SYSTEM ROUTING. CONTRACTOR TO <br /> CONFIRM ROUTING IN FIELD PRIOR TO <br /> NSTALLATION OF VACUUM PIPE. <br /> INSTALL ALL PIPING AND ACCESSORIES <br /> PER MANUFACTURER'S INSTRUCTIONS. <br /> © PROVIDE 90 PSI AIR CONNECTION TO <br /> NEW DUST COLLECTOR. SEE SHEET <br /> 40-26—iM26 FOR LOCATION. <br /> PARTIAL 1ST FLOOR PLUMBING PLANKI <br /> SCALE: 1/8"= 1'-0" v <br /> 8' 4' 0 4' 8' 16' <br /> SCALE: 1/8"=1'-0" <br /> 1 3 5 7 9 11 <br /> 0.9 <br /> B DG 40 025 <br /> N <br /> 1M110 1M111 1M112 1M113 1M114 0 <br /> N.3 I <br /> M115 1M116 1M117 1M118 1M119 4 <br /> N.7 0 <br /> 1M120 1M121 1M122 1M123 1M124 <br /> m <br /> P <br /> M125 1M126 1M127 1 MIT 28 1M129 <br /> R <br /> Affiliated ISSUED FOR CONSTRUCTION FUTURE 26 4o—ov <br /> A=I Engineers BUILDING 40-0 <br /> AfRllated E ghee,=,Inc. KEY PLAN N <br /> 5802 Research Park Boulevard <br /> Maa�so�,wseo m 53719 SCALE: NONE <br /> TeI608238.2616 DESIGN BY AEI DATE 02.21.24 <br /> P,ojeet y: <br /> SYM REVISION BY APPROVED DATE SYM REVISION BY APPROVED DATE ACCEPTABILITY RKE 07.17.92 SUBTITLE CURRENT REVISION SYMBOL DATE o <br /> THIS DESIGN AND/oR CHECKED PARTIAL 1ST FLOOR PLUMBING PLAN W8861360 02.21.24 <br /> 737 NORTH LINE—40-26 TOWER RELOCATIONS DP 26.02 W8861360 AEI J.B.,J.P. 02,21.24 — RECORD DRAWING CLEAN—UP 586992-01 DLR GROUP D. FRAHM 05.28.09 F?`°'`;�; RKE 07.17.92 sHEET <br /> Fw^ ^y SPECIFICATION IS APPROVED <br /> A RECORD DRAWING CLEAN—UP 555672-04 DLR GROUP NAP 10.14.05 E SINK REPLACEMENT AND COOLANT RELOCATION W975568 DHT DH/FB 7.18.12 oA�.e z APPROVED BY DEPT. DATE RKE 07.17.92 TITLE 737 NORTH LINE — 40-26 TOWER RELOCATIONS DP 26.02 1 M 126 <br /> CHECKED <br /> B 787 FA RECORD SET 555886 WH C. CARBON 06.2207 F 5X5 RATE READINESS — RECORD SET W1426466 WH SAG 05.09.14 AppgoveD BUILDING 40-026 <br /> � � LMM 07.17.92 doe No. COMP No. <br /> C THIRD FLOOR CONFERENCE CENTER— 60% 586992-01 SAG/WH CEL 10.10.08 G RELOCATE HOSE REEL 16421192 RDN DH/FB 07.03.14 'O^'^� LMM 07.17.92 — <br /> D THIRD FLOOR CONFERENCE CENTER— IFC 586992-01 SAG/WH CEL 10.22.08 H SITE DRINKING FOUNTAINS— RECORD W4100227 FSI CMG 12.15.17 ozizaiz 4 APPROVED MECHANICAL MASTER COL. P—R/3-5 EVERETT, WAI <br /> DWG NO. 40-026-1M126 <br />