Laserfiche WebLink
PL_UVRNG SCHEDULE PLUMBING FIXTURE SCHEDULE <br /> MARK LOCATION KW VOLT PH HZ REMARKS MARK DESCRIPTION WASTE VENT CW HW MANUFACTURER AND MODEL NUMBER* REMARKS <br /> WC-3 11/4" -- AMERICAN STANDARD "AFWALL" 2257.103 FLUSH VALVE: ZURN # ZEMS6000AV-2-IS-WS1 <br /> EWH-1 3RD FLR CLASSROOM 6 208 1 60 INSTANTANEOUS TYPE. FLOW RATE = 1 GPM WATER CLOSET 3 2 # SEAT: BEMIS 1955-SS C <br /> 2ND FLR PCA OFFICE WC-4 WATER CLOSET 3" 2 Y/4' -- SAME AS WC-1 AT BARRIER FREE HEIGHT FLUSH VALVE: ZURN # ZEMS6000AV-2-IS-WS1 <br /> " <br /> EWH-2 2ND FLR KITCHENETTE 6 208 1 60 INSTANTANEOUS TYPE. FLOW RATE = 1 GPM SEAT: BEMIS 1955-SS C <br /> UR-2 URINAL 2" 11/2" 3/`„ -- AMERICAN STANDARD "WASHBROOK' #6501.010 FLUSH VALVE: ZURN # ZEMS6003AV-IS-WS1 <br /> RIM HEIGHT @ 16" AFF <br /> LAV-2 LAVATORY 11/2" 11/2" 1/11 1/2" KOHLER "BROOKLINE" #K-2202 FAUCET: ZURN # Z6915-CWB-TMV-1-F <br /> S-3 BREAK ROOM SINK 2" 11/2' 1d, 1/2" JUST #SL-ADA-2131-A-GR W/ ELKAY FAUCET #LKE4100 <br /> EWC-4 ELECTRIC WATER COOLER 11h" 1112" h" -- ELKAY #ERPBM28K VANDAL RESISTANT BUBBLER <br /> FD-2 FLOOR DRAIN 2" 1112" -- -- JR SMITH #2005Y-A W/ TRAP PRIMER CONNECTION <br /> P LU M B N C FIXTURE SCHEDULE FD-3 FLOOR DRAIN 2" 11/2 -- -- JR SMITH #2005-A W/ FUNNEL #3580-NB <br /> MARK DESCRIPTION WASTE VENT CW HW MOUNT. REMARKS <br /> EWC-3 ELECTRIC WATER COOLER 1�^ 11/2" �" 34" WALL MOUNTED (HANDICAPPED) <br /> S-1 SINK 2" lib" 1h" 1/�" -- ELECTRIC WATER HEATER <br /> S-2 SINK 2^ 11/2" ih" 1/�" STAINLESS STEEL SELF-RIMMING <br /> ELKAY MDL # LK-2522 <br /> MARK LOCATION STORAGE-GAL RECOVERY-GPH TEMP. RISE °F SOURCE CAPACITY REMARKS <br /> F-1 FAUCET -- -- -- -- __ ELKAY MDL # LK-430OF ELECTRICAL <br /> „ IN-SINK-ERATOR MDL # 77 (W/17 GA EWH-6 BELOW COUNTER 2.5 8 90' 120 1 60 1500 WATTS ARISTON GL2.5 <br /> F-1 GARBAGE DISPOSER 11/2" -- -- -- 137/16 CHROME PLATED 1 1/4" TAIL PIECE. EWH-7 RESTROOM 15 31 80• 208TR160 3000/ 3000 WATTS SIMULTANEOUS ELEMENT. AO SMITH DEL-15 <br /> SIT HOT WATER CIRCULATION PUMPS <br /> KIT CHEN EQUIPMENT PLUMBING SCHEDULE (R.I. &C.) MARK LOCATION GPM FLOW FEET OF HEAD MATERIAL SOURCE REMARKS <br /> SAN VENT CW HW CP-1 RESTROOM 5 10 BRONZE ELECTRICAL <br /> UNIT N0. DESCRIPTION REMARKS 110 1 60 GRUNDFOS UP 15-42F <br /> DIA. DIA. DIA. DIA. <br /> MT.HT, MT.HT. MT.HT. <br /> O CARBONATED BEVERAGE DISPENSER 5/8(3)* 1/2 PROVIDE REDUCED PRESSURE BACKFLOW <br /> +18" <br /> �p ESPRESSO MAKER 1/2 <br /> +18" <br /> 2 COFFEE BREWER -- -- -- 1/2" EXPANSION TANKS <br /> 2p SOUP WARMER 1/2 -- -- -- WORKING OPERATING FACTORY <br /> * PROVIDE DRAIN MANIFOLD WITH ACCESIBLE SOV MARK LOCATION TANK VOLUME PRESSURE TEMPERATURE PRE-CHARGE REMARKS <br /> 3 4 ET-1 RESTROOM 2.1 150 PSIG 200'F 55 PSIG AMTROL ST-5-C <br /> 21 REFRIGERATED CONDIMENT PAN * -- -- -- INSULATE DRAIN LINE <br /> 24 ICE & WATER DISPENSER 1/2(2) 1/2 <br /> 1/2 1/2 INSTALL WATER FILTER <br /> 24A ICE MAKER -- +18" -- <br /> ,/2" 12 DOMESTIC WATER PRESSURE BOOSTER PUMPS <br /> 27 FILLER FAUCET -- -- +12" +12" <br /> 3 COMPARTMENT SINK 3" 2„ 2" DRAIN EACH COMPARTMENT MARK LOCATION GPM FLOW FEET OF HEAD MATERIAL SOURCE REMARKS <br /> 30 +10" -- -- 3" TRAP FROM CENTER <br /> ELECTRICAL <br /> O3/4" 3/4" BP-01 LEVEL 2 53 72 CAST IRON 460 3 60 GRUNDFOS CR 10-2 A-GJ-A-E <br /> 30A FAUCET -- -- +ig" +18" 2 SETS BP-02 LEVEL 2 53 72 CAST IRON ELECTRICAL GRUNDFOS CR 10-2 A-GJ-A-E <br /> 33 HAND SINK ' 1/2 1 1/2" 1/2 1/2 460 3 60 <br /> +25' +18" +18" 120' MAXIMUM HOT WATER <br /> 3g ICE BIN 3 4 <br /> 38A ICE MAKER 1/2" _- 1/2" -- DIAPHRAM TANK <br /> * 60" INSTALL WATER FILTER <br /> 1 1 2 MARK LOCATION TANK VOLUME WORKING OPERATING FACTORY REMARKS <br /> 39 WORK TABLE WITH PREPARATION SINK * -- -- -- CONSTRUCTION NOTES <br /> PRESSURE TEMPERATURE PRE-CHARGE <br /> 39A FAUCET 1/2 1/2 EQUIPMENT ROOM <br /> +18" +18" D HT-01 2ND FLR P-9.5 139 150 PSIG 75'F 30 PSIG WESSELS FXT-440 <br /> C-5 FLOOR TROUGH 2 7 1 1/2" -- -- <br /> * INDIRECT WASTE TO FLOOR SINK, PROVIDE MIN. 2" AIR GAP, LOCATE PIPES TO PERMIT REMOVAL OF SEDIMENT BASKET. <br /> pk9lNi <br /> PROFESSIONAL STAMP & SIGNATURE EERS ISSUED FOR CONSTRUCTION <br /> APPLIES TO WORK WITHIN THE CLOUDED Seattle//Spokane//Baltimore DESIGN BY FSi DATE 03.14.24 <br /> REVISION AREAS ONLY AS INDICATED <br /> SYM REVISION BY APPROVED DATE SYM REVISION BY APPROVED DATE DRAWN DATE SUBTITLE CURRENT REVISION SYMBOL DATE <br /> 4. C84 ACCEPTABILITY RKE 07.17.92 PLUMBING SCHEDULE W8861360 D 03.14.24 <br /> RECORD DRAWING ISSUED TO OWNER — RECORD DRAWING ISSUED TO OWNER 565973-02 AEI 07.31.09 THIS DESIGN AND/OR CHECKED <br /> SPECIFICATION IS APPROVED RKE 07.17.92 SHEET <br /> A 787 TRADITIONAL OFFICE JL:547411-16 MH DIE! FB 07.26.06 D 737 NORTH LINE—40-026 WING TANK CLEANOUT W6681360 FSi KMC 03.14.24BOE//VG® W • ENGINEER TITLE 737 NORTH LINE — 40-026 WING TANK CLEANOUT M 0 F <br /> p APPROVED BY DEPT. DATE RKE 07.17.92 <br /> B 40-26.2 CAFE J 567559-00 DLR GROUP RAP 04.05.07 CHECKED <br /> " R MM 071792 BUILDING 40-026 JOB N0. <br /> C BFF— ISSUE FOR CONSTRUCTION 565973 MM 07.17.92 #_02 AEI 07.16.07 fs Osr o + APPROVED J :547411-16 COMP N0. <br /> s HnL cw L <br /> - RECORD DRAWING ISSUED TO OWNER DLR GROUPI NAP 01.28.08 APPROVED MECHANICAL MASTER EVERE T, WA DWG NO. 40-026-MOF <br />