Laserfiche WebLink
GENERAL NOTES <br /> 1. FOR BILL OF MATERIALS, REFER TO EMCS <br /> DRAWING E923-4. <br /> CONSTRUCTION NOTES <br /> PROVIDE NEW LABEL TO EXISTING PIPE AS <br /> PUMPED PROCESS COLD WATER" (PPCW). <br /> PROVIDE PPCW PIPE AND CONNECT TO <br /> EXISTING. <br /> 1"PPCW 1"PPCW <br /> TO HATCHES TO HATCHES <br /> SLANT 14 SLANT 12 <br /> 1"PPCW <br /> 1"PPCW SLANT 11 / <br /> TO HATCHES FLOW DAY 11 <br /> PI PI FLOW DAY 13 <br /> 310 311 <br /> WATER HAMMER <br /> 2 3"PPCW 2 3"PPCW�1 2 3"PPCW ARRESTER <br /> PI I EMCS BP 2 <br /> 3XX I 3"PPcw�i I <br /> 31AJ I <br /> r I 1"PPCW 1"PPCW 1"PPCW <br /> PT PT PI PI I PT PT FS TT TO ISLET TO ISLET TO ISLET <br /> 3XX 3XX 3XX BP 3XX L SC 306 3XX 307 3XX X �3 FLOW DAY 6 FLOW DAY 8 FLOW DAY 9 <br /> COLD WATER 3"PPCW 3B 3"PPCW'Z:::� III------t5``/ <br /> 3"CW RPDP .o p' y HT I P���P� 3"AW 1 <br /> 1 3" <br /> MECH. RM. TUNNEL 2 <br /> RFI-X <br /> 1"PPCW <br /> TO ISLET <br /> FLOW DAY 7 <br /> PUMPED PROCESS COED WATER FLOW DIAGRAM <br /> SCALE: NOT TO SCALE <br /> F#MEERS <br /> DCI\I-03, IN-LINE REMOVAL ADD. <br /> PROFESSIONAL STAMP & SIGNATURE ISSUED FOR CONSTRUCTION <br /> APPLIES TO WORK WITHIN THE CLOUDED Seattle//Spokane//Baltimore DESIGN BY FS DATE 04.26.24 <br /> REVISION AREAS ONLY AS INDICATED <br /> SYM REVISION BY APPROVED DATE SYM REVISION BY APPROVED DATE DRAWN DATE SUBTITLE CURRENT REVISION SYMBOL GATE <br /> M GH o HSC ESIIGNBND R CHEKED o3.14.z4 COLD WATER FLOW DIAGRAM <br /> a W8861360 -X 04.26.24 <br /> ORIG 737 NORTH LINE-40-026 WING TANK CLEANOUT W8861360 FSi KMC 03.14.24 ~P`'� '� SPECIFICATION IS APPROVED KMC 03.14.24 SHEET <br /> RFI-X 737 NL-40-26 WiC DCN-03-IN-LINE REMOVAL ADD. W8861360 FSi KMC 04.26.24BOE//VG® W APPROVED BY DEPT. DATE KRLNEER 03.14.24 TITLE 737 NORTH LINE - 40-026 WING TANK CLEANOUT M334 <br /> CHECKED <br /> STjR �� APPROVED BUILDING 40-026 JOB N0. COMP NO. <br /> SS/ONAL ENS\ <br /> APPROVED MECHANICAL MASTER EVERETT, WA IIWI 10. 40-026-M334 <br />