Laserfiche WebLink
9 9.5 LEGEND <br /> FOR SYMBOLS AND ABBREVIATIONS, REFER TO SHEET MOD <br /> AWR = AQUEOUS WASH RETURN <br /> _----- T - --- GENERAL NOTES <br /> TRAP SHALL BE ARMSTRONG 983-30 <br /> TRAP SHALL BE ARMSTRONG 980-60 <br /> FOR HVAC DRAIN TRAP CONNECTION DETAIL, <br /> SEE <br /> M454 M566 <br /> ® FOR RFPB CONNECTION DETAIL, SEE 5 <br /> M454 M567 <br /> 5. WATER HEATER PIPING SYSTEM VALVES AND STRAINERS: <br /> MPS GATE VALVES: CRANE 465 1/2 <br /> MPS BALL VALVES: APOLLO 70-100 <br /> C 6 MPS WYE STRAINERS: PPI YFC125 <br /> FOR CONNECTION, SEE CONDENSATE BALL VALVES: APOLLO 70-100 <br /> M454 M567 CONDENSATE CHECK VALVES: CRANE 137 <br /> WH CONDENSATE WYE STRAINERS: PPI TB150 <br /> 2 13 B WATER 3" BUTTERFLY VALVES: DEMCO 22121-5114351 <br /> M454 M584 WATER 1-1/4" BALL VALVES: APOLLO 82-200 (3—PIECE) <br /> UNIT HEATER, SEE 4"MPS DIN TO WH-13 WATER 3" CHECK VALVES: CRANE 373 <br /> M454 M567 <br /> UH FS ET 1"CW ON TO 13 WATER 1-1/4" CHECK VALVES: CRANE 10707S <br /> 35 4 13 <br /> R 1 G D, <br /> 3"C D 6. -VAC DUCTWORK SPECIFICATIONS ON SHEET MOi SHALL APPLY. <br /> 2"CD DN 3"CW 3"CHWR & CHWS DIN7. REFER TO 40-026—MOi FOR HVAC PIPING SPECIFICATIONS. <br /> 3 4"CD DW TO 48x48 THRU FIRST FLO <br /> FIRST FLOOR i A <br /> 2 1"MPS DIN3/4'TP M454 M584 <br /> ti 2"CD DN CHWS 1 3"HW DN REMOVAL NOTES <br /> I ` _ 3"MPS DN ; <br /> 1 H R 1YAW <br /> 2460 - <br /> I ----____ 3 FS 1-1 2�WR BE <br /> REMOVE AQUEOUS WASH RETURN (AWR) PIPING. <br /> FLEX CONN 3/4"TP 1 4 G REMOVE EXISTING STEAM INSTANTANEOUS WATER HEATER <br /> T WH-13, ET-13 AND ASSOCIATED PIPING BACK TO PEEP. <br /> REMOVE 4" MPS PIPING BACK TO TEE, CONVERT TEE TO <br /> ELBOW. REMOVE ASSOCIATED CONDENSATE PIPING BACK <br /> 1-1/2"ID ON I I TO NEAREST TEE. <br /> HOUSEKEEPING PAD ® REMOVE EXISTING BOOSTER PUMP BP-1 AND ITS <br /> APPURTENANCES. <br /> STEAM COIL <br /> CONNECTION, SEE HVAC <br /> M454 <br /> COOLING COIL M566 33 <br /> CONNECTION, SEE 3 <br /> TRAP PRIMER DDC PANEL <br /> M454 M566 4"MPS 3/4'TP DIN <br /> REFERENCED DRAWINGS <br /> ------_-----j --------_--- <br /> 18"4 UP---aPIPE GUIDE <br /> DETAIL, SEES\ (TYp) <br /> M454 M535 <br /> EXHAUST DUCT—/c L J <br /> ENLARGED HVAC PLAN <br /> SCALE: 1/4"=1'—O" 2M29, 2M79, M454 <br /> ISSUED FOR CONSTRUCTION <br /> PfK� 4' 2' 0 2' 4' 8' <br /> REMOVAL PROFESSIONAL STAMP & SIGNATURE EERS RIM RIM F==I <br /> APPLIES TO WORK WITHIN THE CLOUDED Seattle//Spokane//Baltimore DESIGN BY FS DAI E 03-1 T.24 SCALE: 1/4"=1'-O" <br /> REVISION AREAS ONLY AS INDICATED <br /> SYM REVISION BY APPROVED DATE SYM REVISION BY APPROVED DATE DRAWN DATE SUBTITLE CURRENT REVISION SYMBOL DATE <br /> M. CH, ACCEPTABILITY D.VU 05.30.0s ENLARGED HVAC PLAN REMOVAL W8861360 G 03.14.24 <br /> ORIG 787 FA 555886 RECORD SET WH C. CARBON 06.22.07 „PEA SPECIFI THISCATION IS APDESIGN ANDPOR CH K ROVED C. LARSON 05.30 ENUINIELK .06 SHEET <br /> A 787 SURGE LINE WH SAG 10.15.12 BO'Erl w" APPROVED BY DEFT. DATE D.VU 05.30.06 TITLE 737 NORTH LINE — 40-26 WING TANK CLEANOUT M <br /> B AQUEOUS WASH POS 3 — RECORD 252 JAL FSG 12.19.18 CHECKED M 4 54 R <br /> G ARSON 05.30.06 BUILDING 40-026 <br /> k sA APPROVED JOB N0. COMP N0. <br /> C 737 NORTH LINE— 40-26 WING TANK CLEANOUT W8861360 FSi KMC 03.14 ni.24 fssrox ENc` 555886 <br /> APPROVED MECHANICAL MASTER COL. 7-8/N.5—P ORIG Dwc No. 40-026—M454R <br />