Laserfiche WebLink
LEGEND <br /> AWR = AQUEOUS WASH RETURN <br /> 3"IW 1/4" MESH 316E SS SCREEN GENERAL NOTES <br /> 3 SIMILAR <br /> 2-1/2"D EMBED DRAIN OUTLET M584 M583 <br /> d v R <br /> 4°IW CLEANOUT p o 0 <br /> 2"p 316E SS <br /> 3"IW <br /> 2"D POC ����;�� <br /> 4"IW MOUNTING TAB <br /> 4"A 4"A <br /> POC 2"D <br /> D <br /> POC <br /> 4"IW 3"D <br /> REMOVAL NOTES <br /> 14 REMOVE AQUEOUS WASH (AW) PIPE LABEL. <br /> AQUEOUS WASH SYSTEM SIGN 3 REMOVE AQUEOUS WASH RETURN (AWR) PIPIN!;. <br /> DETAIL TYPICAL SUMP DRAIN DETAIL 2 SCALE: NTS M314, M324 M584 <br /> SCALE: 3/8" = 1'-0" UGM118 M584 N SCALE: 3/8" = 1'-0" M458, M70NS ON <br /> 0 M584 R POSIITONB30T AND UPOSITION SH 04 ONAFACTORY <br /> FLOOR. REMOVAL WILL BE DONE BY VECA, <br /> LOCATIONS ARE ON EMCS DRAWINGS. <br /> ® REMOVE EXISTING BOOSTER PUMP BP-1 AND <br /> ITS APPURTENANCES. <br /> 3"CHWR/S <br /> 3"AW FLOW ELEMENT STRAINER <br /> [j:�:--- !�: REFERENCED DRAWINGS <br /> WATEETR--'r'rE TER 3„AW B <br /> oA <br /> RPBP <br /> TO 3-WAY VALVE PRESSURE TRANSMITTER A YAW <br /> AND BYPASS W04FR- (PT-306) 4 BYPASS <br /> - 3"CW FLOW SWITCH (FS-307) 2 <br /> 3"AW <br /> BOOSTER PUMP® 1-1/2"AWR 3"AW BOOSTER PUMP 3"AW <br /> 3"AW-TO FIRST FLOOR <br /> B <br /> SECTION RR SECTION RM5 <br /> SCALE: 3/8" = 1'-0" M454�M584 SCALE: 3/8" = 1'-0" M454�M584 <br /> PUSH BUTTON STATION <br /> SCALE: NITS M314, 024 M584 <br /> ISSUED FOR CONSTRUCTION 0.66' 0.33' 0 0.33' 0.66' 3r <br /> REMOVAL F!LEERS PROFESSIONAL STAMP & SIGNATURE <br /> APPLIES TO WORK WITHIN THE CLOUDED Seattle//Spokane//Baltimore G S,N 5' T'- DATE 03.14.24 SCALE: 1 112"=--0" <br /> REVISION AREAS ONLY AS INDICATED <br /> SYM REVISION BY APPROVED DATE SYM REVISION BY APPROVED DATL DRAWN DATE SUBTITLE CURRENT REVISION SYMBOL DATE <br /> M. Gy ACCEPTABILITY K.CARSON 30.11 W8861360 B 03.14.24 <br /> - 787 SURGE LINE WH SAG 10.15.12 qo THIS DESIGN AND/OR CHECKED PIPE SUPPORT DETAILS POSITION#4-REMOVAL <br /> p, SPECIFICATION IS APPROVED S.GRAYSON 11.30.11 SHEET <br /> A AQUEOUS WASH POS 3 - RECORD wes 252 JAL FSG 12.19.18BOE//VG® W TITLE 737 NORTH LINE - 40-26 WING TANK CLEANOUT M584R <br /> APPROVED BY DEPT. DATE S.GRAYSON 11.30.11 <br /> B 737 NORTH LINE — 40-26 WING TANK CLEANOUT W8861360 FSi KMC 03.14.24 CHECKED <br /> R „ APPROVED <br /> E 3°." <br /> St BUILDING 40-026 JOB NO. COMP NO. <br /> �� <br /> WO 15/2899-1022 <br /> 114 <br /> APPROVED MECHANICAL MASTER EVERETT, WA DWG No. 40-026-M584R <br />